Browsing "GRADUATE SCHOOL OF ENGINEERING[S](공학대학원)" byTitle

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 61 to 80 of 3472

Issue DateTitleAuthor(s)
2018-02A study on Fluorine doped ZnON Thin Film Transistor fabricated by Co-Sputtering method.Cho, Hyeon Su
2018-08A study on the adsorption characteristics of various sorbents for gaseous phase aldehyde by air server/thermal desorption - gas chromatography/mass spectroscopy (AS/TD-GC/MS) & Sensor조민규
2011-08A Study on the Mechanical Properties of Recycled Aggregate Concrete based on Bonded Mortar Content무하매드샤히드
2014-02AC 직결형 LED 구동 회로강일영
2012-02AC 회생형 HEV/EV 배터리 충·방전 시스템에 관한 연구나종국
2008-02Acoustic Emission을 이용한 사면계측에 관한 연구김석천
2019ADAS 전원공급을 위한 차량용 Linear Regulator 설계김영주
2016-02Advantage of Improved Design Procedure with 3-D Modeling for Various Civil Steel Structures in Petrochemical Plants김철민
2007-08AEC 관점에서의 3D CAD 활용 저조에 대한 영향요인 분석 연구이강홍
2008-02Aerosol Flame Deposition(AFD)법에 의한 리튬 이온 이차전지용 LiCoO₂ 양극활물질 나노분말 제조에 관한 연구이태원
2018-08AHP 기법을 이용한 시공책임형 CM 프로젝트 장애요인 중요도 분석손광남
2013-08AHP 기법을 적용한 3PL 기업의 내부 프로세스 개선 우선순위 결정에 대한 사례연구김방현
2015-08AHP 기법을 활용한 글로벌 조달 프로젝트의 위험요소 연구김세중
2010-08AHP 기법을 활용한 의료기기 개발 프로젝트의 위험 요소 연구정신영
2019AHP 기법을 활용한 풍력발전 사업의 위험요인 평가전용진
2024AHP 및 사례분석을 통한 시설물 입찰제도의 안전진단 Pre-Qualification 개선방안 연구김지용
2008-08AHP(Analytic Hierarchy Process)를활용한 단지내 교량구조형식결정방안에 관한 연구안수완
2010-08AHP기법을 이용한 초고층 건축물 시공에서의 공사비 상승요인 분석에 관한 연구양성용
2015-08AHP를 활용한 공동주택 설계변경 중요도 분석 연구오태진
2016-02AHP를 활용한 러시아 LNG 액화 플랜트 설계프로젝트의 리스크 분석위왕복

BROWSE