Browsing "INDUSTRIAL ENGINEERING(산업공학과)" byTitle

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 67 to 86 of 307

Issue DateTitleAuthor(s)
2008-02Maximal Association Rules를 이용한 제조공정에서의 불량 검출 방법최동현
2024Multi-Agent Reinforcement Learning for Optimizing Path Planning of Transporters Considering the Congestion윤성재
2015-08Multi-agent System for the decentralized dynamic vehicle routing problem이반스
2010-02Multi-phase 반도체 제조공정에서 functional 입력 데이터를 위한 모니터링 시스템장동윤
2024Multivariate Time Series Forecasting with Dynamic Graph Learning Layer Reflecting Temporal and Spatial Features황예준
2023One-Class Factorization Machine from Implicit Feedback using Negative Sampling김병헌
2010-08One-Shot Device의 저장 수명 추정방법에 관한 연구 : 와이블 분포의 경우김성일
2019-02Online Modularity Clustering based on One-class SVMsGeon Seok Lee
2011-08Optimal R&D Investment considering the Product Life Cycle손혜연
2017-08Ouptut Power Predicition From Solar Cell Energy Panles Using Stochastic Irradiance MovementsMindiashviliMelano
2018-02Palletizing and Scheduling for Flexible Manufacturing Systems with Multi-fixturing PalletsLee, Dong Kyu
2021Priority Rule and Machine Learning based Scheduling for a Flexible Manufacturing System with Multi-fixturing Pallets허성식
2020-02Priority Scheduling for a Flexible Manufacturing System with Multiple Loading/unloading Stations and Multi-fixturing Pallets최한얼
2014-02Protein Structure Determination via Molecular Distance Geometry Problem Based on Beta-complexes서정연
2008-02Quasi-triangulation을 이용한 단백질의 3차원 구조 유사성김재구
2012-02Quasi-triangulation의 심플렉스 Query 최적화와 이를 이용한 단백질 분자구조 분석김재관
2011-02R&D투자 의사결정을 위한 실물옵션 의사결정나무 모델정영기
2017-08Ramp Time을 고려한 Power Cycling Test의 가속수명 시험법정용백
2010-02Rate-Modifying 활동이 있는 병렬기계의 Makespan의 최소화를 위한 휴리스틱 방법고윤환
2022Scheduling Algorithms for Multi-Stage Flow Shops with Reworks under Overlapped Queue Time Limits김현일

BROWSE