설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구

Title
설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구
Other Titles
Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project
Author
김재준
Keywords
설계시공일괄입찰공사; 설계변경; 클레임; design-build; change order; claim
Issue Date
2012-05
Publisher
한국건축시공학회
Citation
한국건축시공학회 학술발표대회 논문집, 2012, 12(1), P.129-130
Abstract
Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary’s claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.
URI
http://kiss.kstudy.com/thesis/thesis-view.asp?key=3448506https://repository.hanyang.ac.kr/handle/20.500.11754/74898
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE