사례분석을 통한 철도역사 건설사업의 공정관리방안에 관한 연구
- Title
- 사례분석을 통한 철도역사 건설사업의 공정관리방안에 관한 연구
- Other Titles
- A Study on the schedule management of the train station construction using case studies
- Author
- 김주형
- Keywords
- 철도역사; 공정관리; 사례분석; train station; schedule management; case studies
- Issue Date
- 2011-10
- Publisher
- 대한건축학회 / ARCHITECTURAL INSTITUTE OF KOREA
- Citation
- 대한건축학회 추계학술발표대회 논문집 구조계 제31권 제2호 통권 제56집 (20111029), p. 427-428
- Abstract
- As part of global attention about sustainable development, it is increased that the importance of railroad transportation. Thus, the construction of train stations is likely to continue to increase, and the importance of systematic management will increase as well. However, due to construction delay, train station projects have the problems such as cost losses, reduced productivity. Therefore, this study finds out the delay factors of the construction of a train station by analyzing several cases and suggests an efficient scheduling management method. This study result can prevent construction delay considering delay factors from the planning stage.
- URI
- http://www.dbpia.co.kr/Article/NODE01825935
- Appears in Collections:
- COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
- Files in This Item:
There are no files associated with this item.
- Export
- RIS (EndNote)
- XLS (Excel)
- XML