424 0

사례분석을 통한 철도역사 건설사업의 공정관리방안에 관한 연구

Title
사례분석을 통한 철도역사 건설사업의 공정관리방안에 관한 연구
Other Titles
A Study on the schedule management of the train station construction using case studies
Author
김주형
Keywords
철도역사; 공정관리; 사례분석; train station; schedule management; case studies
Issue Date
2011-10
Publisher
대한건축학회 / ARCHITECTURAL INSTITUTE OF KOREA
Citation
대한건축학회 추계학술발표대회 논문집 구조계 제31권 제2호 통권 제56집 (20111029), p. 427-428
Abstract
As part of global attention about sustainable development, it is increased that the importance of railroad transportation. Thus, the construction of train stations is likely to continue to increase, and the importance of systematic management will increase as well. However, due to construction delay, train station projects have the problems such as cost losses, reduced productivity. Therefore, this study finds out the delay factors of the construction of a train station by analyzing several cases and suggests an efficient scheduling management method. This study result can prevent construction delay considering delay factors from the planning stage.
URI
http://www.dbpia.co.kr/Article/NODE01825935
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE