326 0

선로 이송장치 가설공법을 적용한 철도판형교 유도상화

Title
선로 이송장치 가설공법을 적용한 철도판형교 유도상화
Other Titles
An experimental construction of railway steel plate girder strengthen adding ballast system by transport equipment
Author
서종원
Keywords
철도차량; 기관차
Issue Date
2011-05
Publisher
한국철도학회 / The Korean Society For Railway
Citation
한국철도학회 학술발표대회논문집, Vol.2011 No.5 [2011], 707-716(10쪽)
Abstract
It has been applied using cranes or insertion methods to install heavy structures to strengthen existing railway bridges. These methods are uneconomical because of two reasons. The first one is it is required to construct approach roads for heavy equipment and/or working yard. The second one is the electric lines shall be cutoff during construction. Both require additional construction cost and duration. In this study, new transport eq
URI
http://www.dbpia.co.kr/Article/NODE01658611http://www.ndsl.kr/ndsl/search/detail/article/articleSearchResultDetail.do?cn=NPAP10089504
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > CIVIL AND ENVIRONMENTAL ENGINEERING(건설환경공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE