우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석
- Title
- 우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석
- Other Titles
- BIM-based Design Verification Performance Analysis with Priority Rules Applied
- Author
- 김재준
- Keywords
- 우선순위 대기행렬; 큐잉 모델; 인적자원 분배; BIM 설계검증; BIM 성과분석; Priority Queue; Queuing Model; Human Resource Allocation; BIM Design Verification; BIM Performance Analysis
- Issue Date
- 2021-09
- Publisher
- 한국BIM학회
- Citation
- 한국BIM학회 논문집, v. 11, NO. 3, Page. 1-11
- Abstract
- BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first.
The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.
- URI
- http://koreascience.or.kr/article/JAKO202130548386141.pagehttps://repository.hanyang.ac.kr/handle/20.500.11754/176875
- ISSN
- 2288-1697;2288-1697
- DOI
- 10.13161/kibim.2021.11.3.001
- Appears in Collections:
- COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
- Files in This Item:
There are no files associated with this item.
- Export
- RIS (EndNote)
- XLS (Excel)
- XML