국내 최초 Industrial IPD(I2PD) 프로젝트 사례분석을 통한 Pre-construction BIM 적용을 위한 성공요소 도출

Title
국내 최초 Industrial IPD(I2PD) 프로젝트 사례분석을 통한 Pre-construction BIM 적용을 위한 성공요소 도출
Other Titles
Case Study on Pre-construction BIM Application of First IPD-based Industrial Plant Project in Korea
Author
김재준
Keywords
IPD(Integrated Project Delivery); BIM(Building Information Modeling); Pre-construction
Issue Date
2020-06
Publisher
한국CDE학회
Citation
한국CDE학회 논문집, v. 25, no. 2, page. 111-122
Abstract
Recently, the domestic construction industry has been introducing the new delivery systems such as IPD, CM at Risk and Pre-Con. This is delivery method that can further enhance the usability of BIM technologies, enabling direct and effective support of construction management tasks performed during the Pre-construction phase. However, there are no BIM application methods, procedures, or strategies in this delivery system in domestic so far, it remains in limited BIM application, which was used under the existing design-bid-build method. In this research, the case of IPD and BIM applied to industrial plant construction project for the first time in Korea is analyzed and, by doing so, the success factors for BIM application in IPD project are derived. The single case study was used as a research methodology, and the success factors of IPD BIM are derived by conducting face-to-face interviews with key stakeholders who actually participated in the case project.
URI
https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE09349352&language=ko_KRhttps://repository.hanyang.ac.kr/handle/20.500.11754/167156
ISSN
2508-4003; 2508-402X
DOI
10.7315/CDE.2020.111
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE