공기연장 실태조사를 통한 발주자중심 공기지연 리스크 대응방안

Title
공기연장 실태조사를 통한 발주자중심 공기지연 리스크 대응방안
Other Titles
A Proposal for Risk Response Development for Owner of Public Apartment Housing Construction Delay Using Case Study of Time Extension
Author
김경래
Keywords
공기지연; 리스크; 공기연장
Issue Date
2002-01
Publisher
대한건축학회
Citation
대한건축학회논문집-구조계, v. 17, no. 12, page. 159-166
Abstract
There are still so many uncertain factors in the construction project related to the ground conditions, the circumstances of a construction site and surrounding by the multistage labor and custom-built production in construction works. Thus, these factors frequently cause the construction to delay and construction period has to be very often adjusted. This study classifies the factors which cause the construction to delay during construction of apartment houses. According to this classification, the frequency of occurrence of factors in the actual construction site are analyzed and the time extension period is identified. Also it presents risk response development of construction delay not to occur the factors in future projects.
URI
http://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE00365579?https://repository.hanyang.ac.kr/handle/20.500.11754/156910
ISSN
1226-9107; 2384-1788
Appears in Collections:
ETC[S] > 연구정보
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE