246 0

심해저 채광 시스템에서 유연관의 안정적인 운용을 위한 부력재 배치 설계

Title
심해저 채광 시스템에서 유연관의 안정적인 운용을 위한 부력재 배치 설계
Other Titles
Arrangement Plan of Buoyancy Modules for the Stable Operation of the Flexible Riser in a Deep-Seabed Mining System
Author
배대성
Keywords
flexible riser; deep-seabed mining system; buoyancy module; arrangement plan; multi-body dynamics
Issue Date
2015-06
Publisher
한국해양과학기술원
Citation
Ocean and Polar Research, v. 37, No. 2, Page. 119-125
Abstract
This paper focuses on the efficient arrangement plan of buoyancy modules, which plan is used to secure the safe operation and structural stability of a marine riser. The marine riser is connected between a vessel and seabed devices. The movement of the vessel and the seabed devices are affected by the motion of the riser. The riser of a deep-seabed integrated mining system exerts a strong influence on the healthy transfer of minerals. So, buoyancy modules must be equipped to compensate for the proble which is the structure stability and the dynamic motion. Installation locations and quantities of the buoyancy modules are determined by real sea experiments. But this is not easy to do because in real sea experimental conditions the cost is expensive as well as being, time-consuming and dangerous. Therefore, the locations and quantities should be determined by numerical simulation. This method is called simulation-based design. The dynamic analysis models of the riser and the buoyancy modules are built into the commercial software of DAFUL.
URI
http://www.dbpia.co.kr/Journal/ArticleDetail/NODE06365715https://repository.hanyang.ac.kr/handle/20.500.11754/101045
ISSN
1598-141X
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > MECHANICAL ENGINEERING(기계공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE