302 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author이재헌-
dc.date.accessioned2018-04-19T08:02:27Z-
dc.date.available2018-04-19T08:02:27Z-
dc.date.issued2012-03-
dc.identifier.citation플랜트 저널, 2012, 8(1), P.50-59en_US
dc.identifier.issn1739-7200-
dc.identifier.issn1976-8702-
dc.identifier.urihttp://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201216853108014&dbt=JAKO&org_code=O483&site_code=SS1483&service_code=01-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/69506-
dc.description.abstractThe current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.en_US
dc.language.isoko_KRen_US
dc.publisher한국플랜트학회en_US
dc.subject상호운영성en_US
dc.subject견적 소프트웨어en_US
dc.subject효율en_US
dc.subject데이터베이스en_US
dc.subjectinteroperabilityen_US
dc.subjectestimation softwareen_US
dc.subjectefficiencyen_US
dc.subjectdataen_US
dc.title화공플랜트 견적 소프트웨어 개발에 관한 연구en_US
dc.title.alternativeDevelopment of the Estimation Software for a Petrochemical Planten_US
dc.typeArticleen_US
dc.relation.noNo. 1-
dc.relation.volumeVol. 8-
dc.relation.page50-59-
dc.relation.journal플랜트학술논문집(KOREAN JOURNAL OF PLANT ENGINEERING)-
dc.contributor.googleauthor민봉기-
dc.contributor.googleauthor이재헌-
dc.relation.code2012220554-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDIVISION OF MECHANICAL ENGINEERING-
dc.identifier.pidjhlee-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > MECHANICAL ENGINEERING(기계공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE