2018-06 | Impact of carbon emissions in a sustainable supply chain design for a second generation biofuel | Sarkar, Biswajit |
2016-10 | Impact of Random Defective Rate on Lot Size Focusing Work-In-Process Inventory in Manufacturing System | Biswajit Sarkar |
2017-01 | Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system | 강창욱 |
2019-02 | Impact of safety factors and setup time reduction in a two-echelon supply chain management | Sarkar, Biswajit |
2021-10 | Impact of the Coronavirus disease 2019 and the post-pandemic construction sector (Pakistan) | 강창욱 |
2018-12 | Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand | Sarkar, Biswajit |
2015-11 | An improved best-first branch and bound algorithm for the pallet-loading problem using a staircase structure | 안선응 |
2004-12 | An improved branch and bound algorithm for a strongly correlated unbounded knapsack problem | 강맹규 |
2004-05 | An improved branch and bound algorithm for a strongly correlated unbounded knapsack problem | 강창욱 |
2018-04 | An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders | Sarkar, Biswajit |
2018-04 | An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders | 김종수 |
2020-03 | Improvement of Productivity through the Reduction of Unexpected Equipment Faults in Die Attach Equipment | 허선 |
2018-11 | Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks | 강창욱 |
2019-10 | Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management | Sarkar, Biswajit |
202-01-06 | An integrated batching problem for steel plate manufacturing with bi-strand casting | 김현준 |
2018-09 | An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling-price dependent demand, and investment | Sarkar, Biswajit |
2017-10 | An integrated inventory model with variable transportation cost, two-stage inspection, and defective items | Sarkar, Biswajit |
2017-10 | An integrated inventory model with variable transportation cost, two-stage inspection, and defective items | 신동민 |
2017-04 | An integrated location-allocation model for temporary disaster debris management under an uncertain environment | Biswajit Sarkar |
2000-12 | Integrated Machine Tool Selection and Operation Sequencing with Capacity and Precedence Constraints using Genetic Algorithm | 이영해 |