Browsing "INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과)" byTitle

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 223 to 242 of 732

Issue DateTitleAuthor(s)
2018-06Impact of carbon emissions in a sustainable supply chain design for a second generation biofuelSarkar, Biswajit
2016-10Impact of Random Defective Rate on Lot Size Focusing Work-In-Process Inventory in Manufacturing SystemBiswajit Sarkar
2017-01Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system강창욱
2019-02Impact of safety factors and setup time reduction in a two-echelon supply chain managementSarkar, Biswajit
2021-10Impact of the Coronavirus disease 2019 and the post-pandemic construction sector (Pakistan)강창욱
2018-12Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy DemandSarkar, Biswajit
2015-11An improved best-first branch and bound algorithm for the pallet-loading problem using a staircase structure안선응
2004-12An improved branch and bound algorithm for a strongly correlated unbounded knapsack problem강맹규
2004-05An improved branch and bound algorithm for a strongly correlated unbounded knapsack problem강창욱
2018-04An improved way to calculate imperfect items during long-run production in an integrated inventory model with backordersSarkar, Biswajit
2018-04An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders김종수
2020-03Improvement of Productivity through the Reduction of Unexpected Equipment Faults in Die Attach Equipment허선
2018-11Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks강창욱
2019-10Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain managementSarkar, Biswajit
202-01-06An integrated batching problem for steel plate manufacturing with bi-strand casting김현준
2018-09An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling-price dependent demand, and investmentSarkar, Biswajit
2017-10An integrated inventory model with variable transportation cost, two-stage inspection, and defective itemsSarkar, Biswajit
2017-10An integrated inventory model with variable transportation cost, two-stage inspection, and defective items신동민
2017-04An integrated location-allocation model for temporary disaster debris management under an uncertain environmentBiswajit Sarkar
2000-12Integrated Machine Tool Selection and Operation Sequencing with Capacity and Precedence Constraints using Genetic Algorithm이영해

BROWSE