339 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author서종원-
dc.date.accessioned2018-03-22T01:37:04Z-
dc.date.available2018-03-22T01:37:04Z-
dc.date.issued2013-01-
dc.identifier.citation한국건설관리학회논문집 Korean journal of Construction Engineering and Management, 2013, 14(1), P.144-152en_US
dc.identifier.issn2005-6095-
dc.identifier.urihttp://www.koreascience.or.kr/article/ArticleFullRecord.jsp?cn=GGRHC4_2013_v14n1_144-
dc.identifier.urihttp://hdl.handle.net/20.500.11754/50264-
dc.description.abstractDesign is an iterative, generative, and multidisciplinary process by its nature. Iteration occurs often in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. Contrary to simple design, isolation of the generative iterations in complex design systems is very difficult, but reduction in overall iterations is possible. Design depends upon the information flow within domain and also among various design disciplines and organizations. Therefore, it is suggested that managers should be aware about the crucial iterations causing rework and optimal sequence as well. In this way, managers can handle design parameters related to such iterations pro-actively. There are a number of techniques to reduce iterations for various kinds of engineering designs. In this paper, parameter based Design Structure Matrix (DSM) is chosen. To create this DSM, a survey was performed and then partitioned using a model. This paper provides an easy approach to those companies involved in or intend to be involved in "design and build projects".en_US
dc.language.isoenen_US
dc.publisher한국건설관리학회en_US
dc.subjectDesign managementen_US
dc.subjectConstructionen_US
dc.subjectInformation managementen_US
dc.subjectModeen_US
dc.subjectLean constructionen_US
dc.subjectProject managementen_US
dc.titleDesign Structure Matrix: A Model Proposal and Implementation on Harbor and Building Design Projecten_US
dc.typeArticleen_US
dc.relation.no1-
dc.relation.volume14-
dc.identifier.doi10.6106/KJCEM.2013.14.1.144-
dc.relation.page144-152-
dc.relation.journal한국건설관리학회 논문집-
dc.contributor.googleauthorAkram, Salman-
dc.contributor.googleauthorKim, Jeonghwan-
dc.contributor.googleauthorPi, Seungwoo-
dc.contributor.googleauthorSeo, Jongwon-
dc.relation.code2012220901-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING-
dc.identifier.pidjseo-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > CIVIL AND ENVIRONMENTAL ENGINEERING(건설환경공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE