366 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author김재준-
dc.date.accessioned2018-03-19T01:18:43Z-
dc.date.available2018-03-19T01:18:43Z-
dc.date.issued2012-12-
dc.identifier.citationJournal of the architectural institute of Korea : Planning & design, 2012, 28(12), P.93-101en_US
dc.identifier.issn1226-9093-
dc.identifier.urihttp://www.dbpia.co.kr/Article/NODE02066252-
dc.identifier.urihttp://hdl.handle.net/20.500.11754/48580-
dc.description.abstractThe purpose of architectural competition is to choose the best design to satisfied with the goal of a project. If the matters which are not satisfied with the owner’s requirement can’t be found out in the evaluation phase, however, a good sum may have to be paid for design change. Additionally, as time goes on, the possibilities for modification of the original design will be decreased. For this reason, it can be critical to shorten the design errors with the accurate work in the early part of design phase for success of a project. On this, BIM using extensively since the late 2000’s could be a good alternative. BIM(Building Information Modeling) can minimize design errors through managing data with 3D-based information. Actually, domestic public institutions recognize the advantages of BIM, and are increasing ordering quantity BIM-based project. However, some of the BIM-based projects which were already performed with great expectations have showed some problems. With this background, it is needed to find out the effectiveness for reducing design errors with applying BIM process to the project. Thus, in this study, it will be found out that in what parts of the architectural competition, the effectiveness of BIM process shows up. And, it will be found out that in what parts of the architectural competition, the problems shows up through comparing 2D-based design process and BIM-based design process.en_US
dc.language.isoko_KRen_US
dc.publisher대한건축학en_US
dc.subject공동주택en_US
dc.subject건축설계경기en_US
dc.subjectBIM(Building Information Modeling)en_US
dc.subject평가지표en_US
dc.subject실효성en_US
dc.subjectApartmenten_US
dc.subjectArchitectural Competitionen_US
dc.subjectEvaluation Indicesen_US
dc.subjectEffectivenessen_US
dc.title설계경기 단계의 BIM적용 실효성 분석 - LH공사 공동주택 설계경기 평가 항목을 기준으로 -en_US
dc.title.alternativeAn Analysis of BIM Effectiveness in Architectural Competition - Based on Architectural Competition Evaluation Indicesen_US
dc.typeArticleen_US
dc.relation.no12-
dc.relation.volume28-
dc.relation.page93-101-
dc.relation.journal대한건축학회논문집 계획계-
dc.contributor.googleauthor김우현-
dc.contributor.googleauthor오중근-
dc.contributor.googleauthor김재준-
dc.relation.code2012233169-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDEPARTMENT OF ARCHITECTURAL ENGINEERING-
dc.identifier.pidjjkim-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE