A Study on the Use of Weather Information in Construction Schedule Management

Title
A Study on the Use of Weather Information in Construction Schedule Management
Author
김재준
Keywords
Delay of construction period; Process management; Weather
Issue Date
2011-06
Publisher
28th International Symposium on Automation and Robotics in Construction, ISARC 2011
Citation
Proceedings of the 28th International Symposium on Automation and Robotics in Construction, ISARC 2011, Proceedings of the 28th International Symposium on Automation and Robotics in Construction, ISARC 2011. (Proceedings of the 28th International Symposium on Automation and Robotics in Construction, ISARC 2011, 2011, :1359-1361)
Abstract
Recently, the abnormal climatic changes have been frequently occurred all over world. Construction work is heavily affected by weather because it is mostly performed outdoors unlike other industries. But construction schedule management is not considered by weather in many construction sites and construction work relied on the experience and subjective point of view by superintendent of construction site. That's why the delay of construction is frequently occurred. In order to recovery the delay of construction period, Construction Company carries out their construction by force to reduce the construction period so, poor construction, low quality, negligent accident are occurred. In order to solve these problems, basic study is to be carried out with analysis data of existing study and application of weather information.
URI
http://www.scopus.com/record/display.uri?eid=2-s2.0-84863746621&origin=inward&txGid=5ae360532e4965a43329a6c7d09d166dhttp://hdl.handle.net/20.500.11754/40911
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE