342 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author김재준-
dc.date.accessioned2017-09-04T04:50:52Z-
dc.date.available2017-09-04T04:50:52Z-
dc.date.issued2015-11-
dc.identifier.citationKSCE Journal of Civil Engineering, v. 20, NO 6, Page. 2154-2161en_US
dc.identifier.issn1226-7988-
dc.identifier.issn1976-3808-
dc.identifier.urihttps://link.springer.com/article/10.1007%2Fs12205-015-0476-z-
dc.identifier.urihttp://hdl.handle.net/20.500.11754/28858-
dc.description.abstractThis paper presents an empirical assessment of productivity changes within the Korean Construction Management (CM) industry using a non-parametric Malmquist bootstrap methodology. For the purposes of this paper, the Global Malmquist productivity index (MPIG)-based productivity measurement procedure is designed to evaluate changes in productivity within the CM market between 2006 and 2012. To do so, it uses data from public announcements related to CM capabilities. Productivity estimates were statistically verified using the bootstrapping method. As a result of these estimations, this study showed that despite quantitative industry-wide growth, the average productivity of the service business firms in the Korean CM industry did not increase between 2006 and 2012. In total, the productivity of Korean CM firms were affected by environmental factors, including changes in the businesses cycle of the CM industry. Decreases in a firm's managerial and strategic capabilities resulted in a parallel decline in that firm's actual productivity, despite technical advances in the market. Efforts to promote technical efficiency among some firms, however, could overcome technological declines in the market.en_US
dc.description.sponsorshipThis research was supported by the Basic Science Research Program through the National Research Foundation of Korea (NRF), funded by the Ministry of Education, Science, and Technology (No. 2012R1A1A3013772).en_US
dc.language.isoenen_US
dc.publisherSpringeren_US
dc.subjectconstruction industryen_US
dc.subjectconstruction managementen_US
dc.subjecttotal factor productivityen_US
dc.subjectmalmquist productivity indexen_US
dc.subjectbootstrapen_US
dc.titleMeasuring Productivity Changes in the Korean Construction Management Industryen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s12205-015-0476-z-
dc.relation.page1-8-
dc.relation.journalKSCE Journal of Civil Engineering-
dc.contributor.googleauthorLee, Yoon-Sun-
dc.contributor.googleauthorKim, Jae-Jun-
dc.contributor.googleauthorLee, Tai Sik-
dc.relation.code2015031579-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDEPARTMENT OF ARCHITECTURAL ENGINEERING-
dc.identifier.pidjjkim-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE