155 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author이동호-
dc.date.accessioned2023-08-22T07:53:56Z-
dc.date.available2023-08-22T07:53:56Z-
dc.date.issued2019-03-
dc.identifier.citationENGINEERING OPTIMIZATION, v. 51, NO. 3, Page. 412-426-
dc.identifier.issn0305-215X;1029-0273-
dc.identifier.urihttps://www.tandfonline.com/doi/full/10.1080/0305215X.2018.1469134en_US
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/186023-
dc.description.abstractThis study addresses the problem of determining the allocation of operations and their tools to machines, the operation processing times and the allocation/sequence of the parts to be processed on each machine for flexible manufacturing systems with controllable processing times. Tool lives, tool copies and tool sharing are also considered. An integer programming model is developed for the objective of minimizing the sum of operation processing and tardiness costs. Then, iterative algorithms are proposed that solve the two subproblems iteratively, where the loading subproblem is solved by a modified bin packing algorithm under initial processing times and the resulting scheduling subproblem is solved by a priority scheduling method while modifying the loading plans and operation processing times iteratively. Computational experiments were carried out, and the results are reported.-
dc.description.sponsorshipThis work was supported by the Technology Innovation Program funded by the Ministry of Trade Industry andEnergy Korea (grant code: 10052978-2015-4; title: Development of a jig-center class 5-axis horizontal machining systemcapable of over 24 hours continuous operation).-
dc.languageen-
dc.publisherTAYLOR & FRANCIS LTD-
dc.subjectFlexible manufacturing systems-
dc.subjectcontrollable processing times-
dc.subjectloading and scheduling-
dc.subjectiterative algorithms-
dc.titleLoading and scheduling for flexible manufacturing systems with controllable processing times-
dc.typeArticle-
dc.relation.no3-
dc.relation.volume51-
dc.identifier.doi10.1080/0305215X.2018.1469134-
dc.relation.page412-426-
dc.relation.journalENGINEERING OPTIMIZATION-
dc.contributor.googleauthorZhou, Yi-Dong-
dc.contributor.googleauthorShin, Jeong-Hoon-
dc.contributor.googleauthorLee, Dong-Ho-
dc.sector.campusE-
dc.sector.daehak소프트웨어융합대학-
dc.sector.department인공지능학과-
dc.identifier.piddhlee72-
Appears in Collections:
ETC[S] > ETC
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE