125 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author이동호-
dc.date.accessioned2023-08-22T07:53:53Z-
dc.date.available2023-08-22T07:53:53Z-
dc.date.issued2018-06-
dc.identifier.citationCOMPUTERS & INDUSTRIAL ENGINEERING, v. 120, Page. 266-278-
dc.identifier.issn0360-8352;1879-0550-
dc.identifier.urihttps://www.sciencedirect.com/science/article/pii/S036083521830192X?via%3Dihuben_US
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/186022-
dc.description.abstractThis study considers a scheduling problem for remanufacturing systems with parallel disassembly workstations, a job-shop-type reprocessing shop and parallel reassembly workstations, where the components obtained by disassembling a product must be matched when reassembling the corresponding remanufactured product, i.e. component matching requirement. The problem is to determine the allocation/sequence of jobs on the parallel disassembly workstations, the sequence of the jobs on each workstation of job-shop-type reprocessing shop and the allocation/sequence on the parallel reassembly workstations. To represent the matching requirement, the reprocessing jobs are grouped into job families each of which corresponds to a product to be remanufactured. After an integer programming model is developed, two types of solution algorithms, decomposed and integrated ones, are proposed, where the decomposed ones solve the disassembly, reprocessing and reassembly scheduling sub-problems separately while the integrated ones solve them at the same time after representing the problem as an extended disjunctive graph. Computational experiments were done on a number of test instances and the results show that the integrated algorithms outperform the intuitive decomposed ones significantly.-
dc.description.sponsorshipThis work was supported by the National Research Foundation of Korea grant funded by Korea government (NRF) (Grant Code: 2011-0015888). This is gratefully acknowledged.-
dc.languageen-
dc.publisherPERGAMON-ELSEVIER SCIENCE LTD-
dc.subjectRemanufacturing systems-
dc.subjectJob-shop-type reprocessing shop-
dc.subjectComponent matching requirement-
dc.subjectScheduling-
dc.subjectTotal tardiness-
dc.titleScheduling algorithms for job-shop-type remanufacturing systems with component matching requirement-
dc.typeArticle-
dc.relation.volume120-
dc.identifier.doi10.1016/j.cie.2018.04.048-
dc.relation.page266-278-
dc.relation.journalCOMPUTERS & INDUSTRIAL ENGINEERING-
dc.contributor.googleauthorYu, Jae-Min-
dc.contributor.googleauthorLee, Dong-Ho-
dc.sector.campusE-
dc.sector.daehak소프트웨어융합대학-
dc.sector.department인공지능학과-
dc.identifier.piddhlee72-
Appears in Collections:
ETC[S] > ETC
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE