dc.identifier.citationAUTOMATION IN CONSTRUCTION, v. 126, article no. 103669en_US
dc.identifier.issn0926-5805;1872-7891en_US
dc.identifier.urihttps://www.sciencedirect.com/science/article/pii/S0926580521001205?via%3Dihuben_US
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/176862-
dc.description.abstractBased on the labor-intensive nature of construction tasks and high costs associated with labor operations, reliable estimation of construction labor productivity is crucial. However, owing to the dynamic nature and variety of tasks involved in a construction activity, obtaining accurate and reliable productivity data has proven to be difficult. Herein, a motion data-based modeling approach for estimating the labor productivity is proposed. The method consists of the following: estimating the standard motion time of the tasks, measuring the unit workload of an operation cycle using 3D models, and quantifying the production rates based on the cycle times and unit workloads. Motion-data analysis is also integrated into simulation modeling to incorporate the impact of jobsite conditions. To validate the proposed approach, a case study is applied for estimating the production rate of concrete placement operations. The results demonstrate that the proposed approach can reliably estimate the productivity of the operations.en_US
dc.description.sponsorshipThis research was supported by a National Research Foundation of Korea (NRF) grant funded by the Korean government (MSIT) (No. NRF-2018R1A5A1025137).en_US
dc.languageenen_US
dc.publisherELSEVIERen_US
dc.subjectPredetermined motion time system (PMTS)en_US
dc.subjectMTM-1en_US
dc.subjectSimulation modelingen_US
dc.subjectLabor productivityen_US
dc.subjectCycle time estimationen_US
dc.subjectBuilding information modeling (BIM)en_US
dc.titleManual operation simulation using motion-time analysis toward labor productivity estimation: A case study of concrete pouring operationsen_US
dc.typeArticleen_US
dc.relation.volume126-
dc.identifier.doi10.1016/j.autcon.2021.103669en_US
dc.relation.journalAUTOMATION IN CONSTRUCTION-
dc.contributor.googleauthorKim, JiWook-
dc.contributor.googleauthorGolabchi, Alireza-
dc.contributor.googleauthorHan, SangUk-
dc.contributor.googleauthorLee, Dong-Eun-
dc.sector.campusS-
dc.sector.daehak공과대학-
dc.sector.department건설환경공학과-
dc.identifier.pidsanguk-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > CIVIL AND ENVIRONMENTAL ENGINEERING(건설환경공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE