dc.description.abstractVarious laws and guidelines on designing for safety have been developed world-wide, and these were used to identify risks at construction sites in advance through qualitative and quantitative safe management. In other words, attention is being paid to safe management based on design drawings and models rather than field visits. It was predicted that the introduction of the concept of design-for-safety would minimize risk at construction sites through safe management in the design phase. This is because the efficiency and reliability of such a strategy has been demonstrated in various cases abroad. However, domestic design-for-safety suggests a very limited range of evaluation items, so there is a limit to using such strategies in construction sites. Building information modeling (BIM) technology is attracting attention in situations when safe management must also be based on design proposals. Although previous studies on the identification of falling disasters and automatic identification of hazards have been conducted, these studies only deal with a limited range of items for identifying risk items. For example, BIM-based risk extraction, which is limited to falling disasters, is only at the level of risk recognition that can be derived based on the process table, and evaluation is not made accordingly. It is difficult to assess the overall disaster risk in many of the items required for risk rating estimation. In this paper, we solve the above problems by deriving a BIM-based risk rating estimation scenario based on the disaster scenario for automating BIM-based risk rating estimation, and we developed an evaluation system using this method. The BIM-based risk rating estimation methodology was presented through BIM-based hazard extraction, evaluation of requirement information, evaluation item selection, and using the evaluation system in a design-for-safety review.en_US
dc.description.sponsorshipThis research was supported by a grant (20AUDP-B127891-04) from the Architecture & Urban Development Research Program funded by the Ministry of Land, Infrastructure and Transport of the Korean government. This work was supported by the National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIT) (No. NRF-2019R1F1A1062851).en_US
dc.language.isoen_USen_US
dc.publisherMDPI AGen_US
dc.subjectbuilding information modeling (BIM)en_US
dc.subjectdesign for safety (DfS) reviewen_US
dc.subjecthazard preventionen_US
dc.subjectrisk rating estimationen_US
dc.subjectsafety managementen_US
dc.titleDevelopment of BIM-Based Risk Rating Estimation Automation and a Design-for-Safety Review Systemen_US
dc.typeArticleen_US
dc.relation.no11-
dc.relation.volume10-
dc.identifier.doi10.3390/app10113902-
dc.relation.page1-25-
dc.relation.journalAPPLIED SCIENCES-BASEL-
dc.contributor.googleauthorLee, Y.-
dc.contributor.googleauthorKim, I.-
dc.contributor.googleauthorChoi, J.-
dc.relation.code2020047168-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDIVISION OF SMART CONVERGENCE ENGINEERING-
dc.identifier.pidjungsikchoi-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > ETC
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE