178 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author이태식-
dc.date.accessioned2020-12-16T04:43:00Z-
dc.date.available2020-12-16T04:43:00Z-
dc.date.issued2003-09-
dc.identifier.citation대한토목학회논문집, v. 23, no. 5D, page. 661-673en_US
dc.identifier.issn1015-6348-
dc.identifier.urihttp://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE01224240-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/156247-
dc.description.abstractThe reduction of work hours is focused on increasing labor productivity and quality of a worker's life. However, the production system in the construction industry is based on the labor of daily workers in contrast to other industries, such as the general manufacturing industry and service industry due to characteristics of the construction industry. Therefore, reducing work hours can lower labor productivity due to the interference of the operational continuity. This study analyzes the influence of the reduction of work hours in civil engineering work. The changes of actual work hours and work patterns of construction laborers were analyzed, and the consequent influence on the construction cost and term of works was derived.en_US
dc.language.isoko_KRen_US
dc.publisher대한토목학회en_US
dc.subjectreduction of work hoursen_US
dc.subjectwork patternsen_US
dc.subjectconstruction costen_US
dc.title토목공사의 근무시간 단축에 따른 영향 분석 -공사원가분석을 중심으로-en_US
dc.typeArticleen_US
dc.relation.journal대한토목학회논문집-
dc.relation.code2012100412-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING-
dc.identifier.pidcmtsl-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > CIVIL AND ENVIRONMENTAL ENGINEERING(건설환경공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE