dc.description.abstractRenewable energy sources (RESs) are actively connected with the grid, and thus the requirement for transmission network expansion planning has increased. When RESs are added to the grid as independent power plants under a deregulated power system structure, an independent system operator managing the transmission system should evaluate the impact of RES penetration. The system operator should restrict the capacity of the RES to be installed or perform transmission network expansion planning if necessary. This study proposes risk assessment (RA) based on an exponential risk level (RL) model to evaluate the negative effects of RES penetration and introduces a method of applying RA in scenario-based transmission network expansion planning. The index of RL reduction via a scenario is formulated as an economic efficiency indicator for reducing the RL, based on the result of RA. A case study is performed on an actual power system in South Korea. For two cases based on the penetration of RESs, transmission network expansion planning considering the proposed RA is performed for several scenarios, and then, the best scenario for each case is selected.en_US
dc.description.sponsorshipThis research was supported by Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Education (NRF-2015R1C1A1A02037544).en_US
dc.language.isoen_USen_US
dc.publisherINST ENGINEERING TECHNOLOGY-IETen_US
dc.subjectpower transmission planningen_US
dc.subjectrisk managementen_US
dc.subjectrenewable energy sourcesen_US
dc.subjectpower transmission economicsen_US
dc.subjecttransmission network expansion planningen_US
dc.subjectrisk level assessmenten_US
dc.subjectscenario-based risk level improvementen_US
dc.subjectrenewable energy sourcesen_US
dc.subjectindependent power plantsen_US
dc.subjectderegulated power system structureen_US
dc.subjectindependent system operatoren_US
dc.subjectRES penetrationen_US
dc.subjectexponential risk level modelen_US
dc.subjectRLen_US
dc.subjectRAen_US
dc.subjecteconomic efficiency indicatoren_US
dc.subjectSouth Koreaen_US
dc.titleTransmission network expansion planning considering risk level assessment and scenario-based risk level improvementen_US
dc.typeArticleen_US
dc.relation.no5-
dc.relation.volume12-
dc.identifier.doi10.1049/iet-gtd.2017.1210-
dc.relation.page1081-1088-
dc.relation.journalIET GENERATION TRANSMISSION & DISTRIBUTION-
dc.contributor.googleauthorShin, Je-Seok-
dc.contributor.googleauthorKim, Jin-O-
dc.contributor.googleauthorKim, Sung-Yul-
dc.relation.code2018003488-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDIVISION OF ELECTRICAL AND BIOMEDICAL ENGINEERING-
dc.identifier.pidjokim-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ELECTRICAL AND BIOMEDICAL ENGINEERING(전기·생체공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE