211 95

A Single-stage manufacturing model with imperfect items,inspections,rework, and planned backorders

Title
A Single-stage manufacturing model with imperfect items,inspections,rework, and planned backorders
Author
강창욱
Keywords
imperfect manufacturing system; backordering; defective products; rework; inspection
Issue Date
2019-05
Publisher
MDPI
Citation
MATHEMATICS, v. 7, No. 5, Article no. 446
Abstract
Each industry prefers to sell perfect products in order to maintain its brand image. However, due to a long-run single-stage production system, the industry generally obtains obstacles. To solve this issue, a single-stage manufacturing model is formulated to make a perfect production system without defective items. For this, the industry decides to stop selling any products until whole products are ready to fulfill the order quantity. Furthermore, manufacturing managers prefer product qualification from the inspection station especially when processes are imperfect. The purpose of the proposed manufacturing model considers that the customer demands are not fulfilled during the production phase due to imperfection in the process, however customers are satisfied either at the end of the inspection process or after reworking the imperfect products. Rework operation, inspection process, and planned backordering are incorporated in the proposed model. An analytical approach is utilized to optimize the lot size and planned backorder quantities based on the minimum average cost. Numerical examples are used to illustrate and compare the proposed model with previously developed models. The proposed model is considered more beneficial in comparison with the existing models as it incorporates imperfection, rework, inspection rate, and planned backorders.
URI
https://www.mdpi.com/2227-7390/7/5/446https://repository.hanyang.ac.kr/handle/20.500.11754/114460
ISSN
2227-7390
DOI
10.3390/math7050446
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
2019.05_강창욱_A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders.pdfDownload
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE