Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 김재준 | - |
dc.date.accessioned | 2019-11-26T02:08:53Z | - |
dc.date.available | 2019-11-26T02:08:53Z | - |
dc.date.issued | 2017-06 | - |
dc.identifier.citation | KIBIM Magazine, v. 7, no. 2, page. 25-35 | en_US |
dc.identifier.issn | 2288-1697 | - |
dc.identifier.uri | http://koreascience.or.kr/article/JAKO201731242005290.page | - |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/114459 | - |
dc.description.abstract | Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM . Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study. | en_US |
dc.language.iso | ko_KR | en_US |
dc.publisher | 한국BIM학회 | en_US |
dc.subject | BIM (Building Information Modeling) | en_US |
dc.subject | 시공 BIM | en_US |
dc.subject | BIM 적용수준 | en_US |
dc.subject | 사례 분석 | en_US |
dc.subject | BIM (Building Information Modeling) | en_US |
dc.subject | Construction BIM | en_US |
dc.subject | BIM Level | en_US |
dc.subject | Case Study | en_US |
dc.title | 국내・외 BIM 적용 프로젝트의 BIM 적용수준 비교분석- BIM 저널 및 Awards 수상작 사례를 중심으로 - | en_US |
dc.title.alternative | Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - | en_US |
dc.type | Article | en_US |
dc.relation.no | 2 | - |
dc.relation.volume | 7 | - |
dc.identifier.doi | 10.13161/kibim.2017.7.2.025 | - |
dc.relation.page | 25-35 | - |
dc.relation.journal | KIBIM Magazine | - |
dc.contributor.googleauthor | 고성훈 | - |
dc.contributor.googleauthor | 함남혁 | - |
dc.contributor.googleauthor | 이주성 | - |
dc.contributor.googleauthor | 윤수원 | - |
dc.contributor.googleauthor | 김재준 | - |
dc.contributor.googleauthor | Koh, Sung-Hoon | - |
dc.contributor.googleauthor | Ham, Nam-Hyuk | - |
dc.contributor.googleauthor | Lee, Joo-Sung | - |
dc.contributor.googleauthor | Yoon, Su-Won | - |
dc.contributor.googleauthor | Kim, Jae-Jun | - |
dc.relation.code | 2017019809 | - |
dc.sector.campus | S | - |
dc.sector.daehak | COLLEGE OF ENGINEERING[S] | - |
dc.sector.department | DEPARTMENT OF ARCHITECTURAL ENGINEERING | - |
dc.identifier.pid | jjkim | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.