dc.description.abstractUncertain risk factors increase according as building construction projects in present are larger and more complicated and this is numerous risk factors compared with others because building construction process are many interested parties. Although parties of construction projects recognize importance of schedule risk management, they feel constraint because risk management process and tools are not systematized. So construction managers need more developed risk management system which recognize risk factor of occurrence possibility and need to deal with risk adequately through risk management system. In accordance with this situation, the object of this study is finding risk factors on the reinforced concrete construction, and analyzing influence of risk factors in relation to construction cost increase and schedule delay. Through this study, we have made it possible to extract items to care about, from the point of construction cost increase and schedule delay on the reinforced concrete construction, And for this reason, we can predict the parts which has potential to be a problem and prepare for it in advance.en_US
dc.language.isoko_KRen_US
dc.publisher대한건축학회en_US
dc.subject철근콘크리트공사en_US
dc.subject계층의사결정기법en_US
dc.subject공정리스크en_US
dc.subjectIDEF0en_US
dc.subjectFrame Constructionen_US
dc.subjectAnalytic Hierarchy Process(AHP)en_US
dc.subjectSchedule Risken_US
dc.subjectIntegration DEFinitionen_US
dc.title철근콘크리트 공사의 리스크 요인이 공사비 상승 및 공기 지연에 미치는 영향에 관한 연구en_US
dc.title.alternativeA Study about Influence of Risk Factors in Relation to Construction Cost Increase and Schedule Delay on the Reinforced Concrete Constructionen_US
dc.typeArticleen_US
dc.relation.journal대한건축학회논문집-
dc.contributor.googleauthor김경훈-
dc.contributor.googleauthor김경환-
dc.contributor.googleauthor이윤선-
dc.contributor.googleauthor김재준-
dc.relation.code2012211009-
dc.sector.campusE-
dc.sector.daehakRESEARCH INSTITUTE[E]-
dc.sector.departmentRESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY-
dc.identifier.pidyoonsunlee-
Appears in Collections:
RESEARCH INSTITUTE[E](부설연구소) > RESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY(공학기술연구소) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE