303 0

건설현장의 CO2 배출 저감형 콘크리트 조달에 관한 사례분석

Title
건설현장의 CO2 배출 저감형 콘크리트 조달에 관한 사례분석
Other Titles
A Case Study for Procurement of CO2 Emissions Reduction Concrete in the Construction Site
Author
태성호
Keywords
LCA; Concrete; Construction Site; CO2.
Issue Date
2016-12
Publisher
한국전과정평가학회
Citation
한국전과정평가학회지, v. 17, No. 2, Page. 73-82
Abstract
The purpose of this study is to conduct a case study for procurement of CO2 emissions reduction concrete in the construction site. For this purpose, mix-proportion and energy consumption for ready mixed concrete were collected from 27 ready mixed concrete manufacturing plant in Korea using on-line questionnaire, visiting, telephone conversation and so on. And Concrete CO2 emission assessment was conducted observing Life Cycle Assessment method defined by ISO 14040 series with mix-proportion and energy consumption. With this, CO2 emission characteristic was analyzed dividing into the group such as compressive strength, admixture, plant region using the result of assessment. Furthermore, comparison analysis of real CO2 emission of a concrete plant and the minimum CO2 emission following was conducted.
URI
http://kiss.kstudy.com/thesis/thesis-view.asp?key=3557516https://repository.hanyang.ac.kr/handle/20.500.11754/103028
ISSN
1229-599x
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > ARCHITECTURE(건축학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE