202 0

시공단계에서의 BIM 적용방안에 관한 연구

Title
시공단계에서의 BIM 적용방안에 관한 연구
Author
김재준
Keywords
Construction Process; BIM; Application
Issue Date
2012-02
Publisher
(사)한국CDE학회
Citation
한국 CAD/CAM 학회 학술발표회 논문집, 2012, 2012(2), P.572-576, 5P.
Abstract
Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.
URI
http://www.dbpia.co.kr/Journal/ArticleDetail/NODE02358659http://hdl.handle.net/20.500.11754/67411
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE