2015-04 | C-CRF를 이용한 복합화력발전소의 발전량 예측 | 허선 |
2020-01 | Clustering and Dispatching Rule Selection Framework for Batch Scheduling | 허선 |
2016-06 | Continuous Conditional Random Field Model for Predicting Electrical Power Output of a Combined Cycle Power Plant | 허선 |
2016-06 | Continuous Conditional Random Field Model for Predicting the Electrical Load of a Combined Cycle Power Plant | 허선 |
2015-02 | Continuous Conditional Random Field에 의한 인터넷 쇼핑몰 신규 고객등급 예측 | 허선 |
2016-06 | Control of G/M-X/1 Queueing System with N-Policy and Customer Impatience | 허선 |
2016-06 | Control of G/MX/1 Queueing System with N-Policy and Customer Impatience | 허선 |
2012-12 | Control of lead time for retailer-supplier contract with stochastic demand and order cancellation | 허선 |
2005-05 | Delay of the Slotted ALOHA Protocol with Binary Exponential Backoff Algorithm | 허선 |
2006-11 | Departure Process of a Single Server Queueing System with Markov Renewal input and General Service Time Distribution | 허선 |
2006-11 | DEPARTURE PROCESS OF SINGLE SERVER QUEUEING SYSTEM WITH MARKOV RENEWAL INPUT AND GENERAL SERVICE TIMES | 허선 |
2002-10 | Deriving a Likelihood Model for Fatigue Lifetime Based on the Physics of Crack-Propagation | 허선 |
2012-12 | Determination of production level in a make-to-stock system with stochastic demands and returns | 허선 |
2020-07 | Development of Indicator of Data Sufficiency for Feature-based Early Time Series Classification with Applications of Bearing Fault Diagnosis | 허선 |
2016-11 | The Dynamic Enterprise Network Composition Algorithm for Efficient Operation in Cloud Manufacturing | 허선 |
2020-06 | Dynamic estimation model for collaboration potential in cloud manufacturing based on markov random fields | 허선 |
2007-11 | An ECA-based Mechanism of Non-blocking Device Coordination for a Ubiquitous Environment | 허선 |
2015-11 | Effect of Unequal Lot Sizes, Variable Setup Cost, and Carbon Emission Cost in a Supply Chain Model | 허선 |
2017-05 | Effects of variable production rate and time-dependent holding cost for complementary products in supply chain model | 허선 |
2020-04 | Efficient genetic algorithm for feature selection for early time series classification | 허선 |
2007-11 | An Evaluation Model of Multimedia Composition Processes | 허선 |
2000-04 | Gate와 threshold가 있는 2단계 서비스의 MX/G/1 모형 | 허선 |
2019-12 | Graphical Model to Diagnose Product Defects with Partially Shuffled Equipment Data | 허선 |
2023-09 | GUM 기반 측정불확도의 평가 및 적용에 의한 품질개선 | 허선 |
2020-03 | Improvement of Productivity through the Reduction of Unexpected Equipment Faults in Die Attach Equipment | 허선 |
2002-07 | Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain | 허선 |
2019-02 | Interactive Q-Learning Approach for Pick-and-Place Optimization of the Die Attach Process in the Semiconductor Industry | 허선 |
2000-06 | M/G/c 대기행렬 시스템의 대기고객수 분석에 대한 근사법 | 허선 |
1999-10 | M/G/c 대기행렬시스템의 대기고객수 분석에 대한 2단계 근사법 | 허선 |
2001-03 | Main queue에 threshold가 있는 M/G/1 Bernoulli feedback 시스템 분석 | 허선 |