Articles268 Collection home page

Browse

| Subscribe to this collection to receive daily e-mail notification of new additions 

Issue DateTitleAuthor(s)
2018-04An integrated model for production and batch shipments for ramp-up production김태복
2018-04A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times이동호
2018-04Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality이동호
2018-03Mathematical model and solution algorithms for capacitated dynamic lot-sizing in remanufacturing systems이동호
2018-03Identification of a Contaminant Source Location in a River System Using Random Forest Models박철진
2018-03Opinion mining using ensemble text hidden Markov models for text classification이기천
2018-03Bayesian analysis of two-phase degradation data based on change-point Wiener process배석주
2018-03Data depth based support vector machines for predicting corporate bankruptcy배석주
2018-03Solid State Drive(SSD)에 대한 가속열화시험 데이터 모델링 및 분석배석주
2018-02Production planning for a two-stage production system with multiple parallel machines and variable production rates김태복
2018-02Solution algorithms to minimise the total family tardiness for job shop scheduling with job families이동호
2018-02Bi-Criterion Scheduling for a Flexible Machining Cell with Multi-fixturing Pallets and Controllable Processing Times이동호
2018-01Data Imputation Using a Trust Network for Recommendation via Matrix Factorization이기천
2017-12CONSTRAINED RANKING AND SELECTION FOR OPERATIONS OF AN EMERGENCY DEPARTMENT박철진
2017-12An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment이동호
2017-11Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments김태복
2017-11Quantitative Analysis Of User Interfaces For Large Electronic Home Appliances And Mobile Devices Based On Lifestyle Categorization Of Older Users박민용
2017-10AN INTEGRATED INVENTORY MODEL WITH VARIABLE TRANSPORTATION COST, TWO-STAGE INSPECTION, AND DEFECTIVE ITEMS김태복
2017-10Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups이동호
2017-10Railway Capacity Allocation Modeling Using a Genetic Algorithm정인재

BROWSE