273 0

공동주택의 공사기간 산정의 문제점 분석

Title
공동주택의 공사기간 산정의 문제점 분석
Other Titles
Problem Analysis for Estimating of Construction Duration of Apartment Building
Author
김주형
Keywords
공동주택; 공사기간; 이토 산정식; Construction Duration; Apartment Buidling; calculation method
Issue Date
2011-04
Publisher
대한건축학회
Citation
대한건축학회 논문집 (구조계), 2011, 31(1), P.163-164
Abstract
Recently, Interest in calculations on period of building construction is increasing, as building construction is to be bigger, complex, diversified. Building construction has many cases which sign a contract including period of construction calculated on basic stage. And a calculation on proper construction period is important at this time. Most of calculations on construction based on the person's experience and subjective judgment differ from practical construction period.That's why we need a proper construction period to minimize the problems and errors on basic planning stage. This thesis shows standards on calculation method of construction period used in Korea by analyzing a existing study to figure out a proper construction period.
URI
http://www.dbpia.co.kr/Journal/ArticleDetail/NODE01834150
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE