dc.description.abstractIn apartments, cost of finishing work comprises a large part of gross construction costs, and also subcontractors put in apartment finishing work outnumber those put for its structure construction by far. As various processes take place at the same time, period of construction widely differs depending on management ability of the constructors. But in most cases, a difference between plan and outcome is caused by incorrect process plan and inefficiency of process management during finishing work. For this reason, field administrators should make sure of precise process by measuring the workload required for finishing work and reflect it to the actual construction. Finishing work in apartments means follow-up works after structural construction and with a number of divided process, is composed of very various and complicated elements. TACT scheduling method, which enhances work efficiency and maintains smooth flow of work by application to the repeated process like finishing work, is a reasonable progress control technique that may reduce the probability of construction delay or rise of construction costs. This study classifies minimum work types applicable to TACT method to maintain efficient flow of work and reflects actual accomplishment ratio to progress control. And eventually it aims to provide construction participators with information needed to establish process plan of finishing work.en_US
dc.language.isoko_KRen_US
dc.publisher대한건축학회en_US
dc.subjectTACTen_US
dc.subject작업량en_US
dc.subject마감공사en_US
dc.subject작업성취율en_US
dc.subject진도관리en_US
dc.subjectWorkloaden_US
dc.subjectFinish Worken_US
dc.subjectPPCen_US
dc.subjectProgress Controlen_US
dc.titleTACT 공정기법의 작업 유형 분류를 통한 진도관리 개선 방안에 관한 연구en_US
dc.title.alternativeA Study on Improvement of Progress Control through Classification of Work Types of TACT Scheduling Methoden_US
dc.typeArticleen_US
dc.relation.no01-
dc.relation.volume27-
dc.relation.page215-222-
dc.relation.journal대한건축학회논문집 구조계-
dc.contributor.googleauthor이승훈-
dc.contributor.googleauthor최청균-
dc.contributor.googleauthor김주형-
dc.contributor.googleauthor김재준-
dc.contributor.googleauthorLee, Seung-Hoon-
dc.contributor.googleauthorChoi, Chung-Gyun-
dc.contributor.googleauthorKim, Ju-Hyung-
dc.contributor.googleauthorKim, Jae-Jun-
dc.relation.code2012233168-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDEPARTMENT OF ARCHITECTURAL ENGINEERING-
dc.identifier.pidjjkim-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE