Probabilistic Risk Analysis & Response Strategy Model for Subway Construction Projects

Title
Probabilistic Risk Analysis & Response Strategy Model for Subway Construction Projects
Author
조효남
Issue Date
2000-07
Publisher
PMC
Citation
8th ASCE Specialty Conference on Probabilistic Mechanics and Structural Reliability
Abstract
This paper presents a systematic probabilistic risk assessment (PRA) and its response strategy model for general construction projects and demonstrates the applicability of the suggested model to a specific subway construction project. Since the approach is able to effectively deal with all the related construction risks in terms of the assumed probability with conditional probability concept that systematically incorporate expert's experiences and subjective judgement, the proposed model with uncertainty modeling using fuzzy set theory is able to apply to all the construction projects with minor modifications in order to confirm specific projects characteristics. The fuzzy approach is very useful, for those countries, such as Korea, where objective probabilistic data for risk assessment is extremely rare, and thus the utilization of subjective judgmental data based on expert's experiences is inevitable.
URI
https://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.506.6252&rep=rep1&type=pdfhttps://repository.hanyang.ac.kr/handle/20.500.11754/162960
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > CIVIL AND ENVIRONMENTAL ENGINEERING(건설환경공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE