395 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author이동호-
dc.date.accessioned2019-12-10T15:40:38Z-
dc.date.available2019-12-10T15:40:38Z-
dc.date.issued2018-12-
dc.identifier.citationINTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v. 25, no. 5, page. 580-589en_US
dc.identifier.issn1943-670X-
dc.identifier.urihttp://journals.sfu.ca/ijietap/index.php/ijie/article/view/3676-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/120996-
dc.description.abstractThis study addresses the common due-date assignment and scheduling problem on a single machine in which job-processing times are not given, but controllable. The problem is to determine the common due-date, the processing times and the sequence of the jobs to be processed on the single machine. The controllable processing times are considered in the discrete form in that the processing time of a job is determined by selecting one of its discretely available ones with different processing costs. In particular, sequence-dependent setups, in which setup times depend on the type of job just completed and the job to be processed, are also considered. A mixed integer-programming model is proposed for the problem that minimizes the sum of earliness, tardiness, due-date assignment and job processing costs. Then, due to the problem complexity, two-stage heuristic algorithms are proposed in which an initial solution is obtained by the positional weights, and it is improved by the pairwise interchange method together with determining job-processing times. Computational experiments were done on a number of random instances, and the results are reported.en_US
dc.description.sponsorshipThis work was supported by the Technology Innovation Program funded by the Ministry of Trade, Industry & Energy, Korea Government. (Grant code: 10052978-2015-4, Title: Development of a jig-center class 5-axis horizontal machining system capable of over 24 hours continuous operation)en_US
dc.language.isoen_USen_US
dc.publisherUNIV CINCINNATI INDUSTRIAL ENGINEERINGen_US
dc.subjectsingle machineen_US
dc.subjectcommon due-date assignment and schedulingen_US
dc.subjectcontrollable processing timesen_US
dc.subjectsequence-dependent setupsen_US
dc.subjectheuristicsen_US
dc.titleCOMMON DUE-DATE ASSIGNMENT AND SCHEDULING ON A SINGLE MACHINE WITH SEQUENCE-DEPENDENT SETUPS AND DISCRETELY CONTROLLABLE PROCESSING TIMESen_US
dc.typeArticleen_US
dc.relation.no5-
dc.relation.volume25-
dc.relation.page580-589-
dc.relation.journalINTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE-
dc.contributor.googleauthorUlugov, Akmal-
dc.contributor.googleauthorShin, Jeong-Hoon-
dc.contributor.googleauthorLee, Dong-Ho-
dc.relation.code2018004021-
dc.sector.campusS-
dc.sector.daehakCOLLEGE OF ENGINEERING[S]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL ENGINEERING-
dc.identifier.pidleman-
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > INDUSTRIAL ENGINEERING(산업공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE