336 0

Full metadata record

DC FieldValueLanguage
dc.contributor.authorSarkar, Biswajit-
dc.date.accessioned2019-11-19T07:33:42Z-
dc.date.available2019-11-19T07:33:42Z-
dc.date.issued2019-02-
dc.identifier.citationROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, v. 55, No. Special SI, Page. 250-258en_US
dc.identifier.issn0736-5845-
dc.identifier.issn1879-2537-
dc.identifier.urihttps://www.sciencedirect.com/science/article/pii/S0736584517302156-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/112446-
dc.description.abstractA two-echelon supply chain model is formulated to reduce lead time and setup time to obtain their impacts on the expected total cost when lead time demand is stochastic in nature. Two different safety factors are utilized to avoid shortages even though the system contains backorder. The lead time is lot size dependent and consists of production time as well as setup time. It does not follow any particular distribution as only mean and standard deviation are known to us. A distribution free approach is used here to handle this situation. Quality improvement and safety factor are related issues to make an impact in the model as they are directly related to the customer satisfaction. The unit production cost is variable and dependent on production rate. An analytical procedure is derived to investigate the effects of reducing lead time, setup time crashing cost, and transportation crashing cost. Some numerical examples are illustrated to test the model. Sensitivity analysis and managerial insights are given to show the applicability of the model.en_US
dc.description.sponsorshipThis work was supported by the 'Development of 3D Printing-based Smart Manufacturing Core Technology' Research Fund (1.180032.01) of UNIST (Ulsan National Institute of Science & Technology) and Ulsan Metropolitan City.en_US
dc.language.isoen_USen_US
dc.publisherPERGAMON-ELSEVIER SCIENCE LTDen_US
dc.subjectSupply chain managementen_US
dc.subjectStochastic demanden_US
dc.subjectSetup time reductionen_US
dc.subjectQuality improvementen_US
dc.subjectTransportation crashing costen_US
dc.titleImpact of safety factors and setup time reduction in a two-echelon supply chain managementen_US
dc.typeArticleen_US
dc.relation.noSpecial SI-
dc.relation.volume55-
dc.identifier.doi10.1016/j.rcim.2018.05.001-
dc.relation.page250-258-
dc.relation.journalROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING-
dc.contributor.googleauthorSarkar, Biswajit-
dc.contributor.googleauthorGuchhait, Rekha-
dc.contributor.googleauthorSarkar, Mitali-
dc.contributor.googleauthorPareek, Sarla-
dc.contributor.googleauthorKim, Namhun-
dc.relation.code2019040217-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING-
dc.identifier.pidbsarkar-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE