211 0

통합 성과 측정지표를 활용한 공급사슬 성과측정시스템의 개발

Title
통합 성과 측정지표를 활용한 공급사슬 성과측정시스템의 개발
Other Titles
Development of the performance measuring system for supply chain using integrated key performance indicators
Author
이영해
Keywords
Supply Chain Management; Key Performance Indicator; SCOR-Model; BSC
Issue Date
2005-12
Publisher
한국SCM학회
Citation
한국SCM학회지, v. 5, No. 2, Page. 101 - 109
Abstract
This research is focused on the development of the performance measuring system for the supply chain. Although there are previous researches about this, they has the limit to measuring the performance. This is oriented that each measuring system deal with a certain level like strategic level, tactical level, or operational level of the supply chain. However, it is necessary to measure the performance in multiple levels collectively. A new performance measuring system using key performance indicators with integrating SCOR-Model(Supply Chain Operations Reference Model) with Balanced Scorecard(BSC) is proposed in this research. Since SCOR-Model and BSC are mainly dealt with strategic level and operational level, the proposed system can overcome the limit of previous researches. Then, this methodology is used to develop the real time performance measuring system.
URI
http://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE02354743&language=ko_KRhttps://repository.hanyang.ac.kr/handle/20.500.11754/111951
ISSN
1598-382X
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE