246 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author안선응-
dc.date.accessioned2019-05-22T06:29:01Z-
dc.date.available2019-05-22T06:29:01Z-
dc.date.issued2018-06-
dc.identifier.citation산업경영시스템학회지, v. 41, No. 2, Page. 24-31en_US
dc.identifier.issn2287-7975-
dc.identifier.urihttp://db.koreascholar.com/Article?code=350727-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/105524-
dc.description.abstractAs a system complexity increases and technology innovation progresses rapidly, leasing the equipment is considered as an important issue in many engineering areas. In practice, many engineering fields lease the equipment because it is an economical way to lease the equipment rather than to own the equipment. In addition, as the maintenance actions for the equipment are costly and need a specialist, the lessor is responsible for the maintenance actions in most leased contract. Hence, the lessor should establish the optimal maintenance strategy to minimize the maintenance cost. This paper proposes two periodic preventive maintenance policies for the leased equipment. The preventive maintenance action of policy 1 is performed with a periodic interval, in which their intervals are the same until the end of lease period. The other policy is to determine the periodic preventive maintenance interval minimizing total maintenance cost during the lease period. In addition, this paper presents two decision-making models to determine the preventive maintenance strategy for leased equipment based on the lessor’s preference between the maintenance cost and the reliability at the end of lease period. The structural properties of the proposed decision-making model are investigated and algorithms to search the optimal maintenance policy that are satisfied by the lessor are provided. A numerical example is provided to illustrate the proposed model. The results show that a maintenance policy minimizing the maintenance cost is selected as a reasonable decision as the lease term becomes shorter. Moreover, the frequent preventive maintenance actions are performed when the minimal repair cost is higher than the preventive maintenance cost, resulting in higher maintenance cost.en_US
dc.language.isoko_KRen_US
dc.publisher한국산업경영시스템학회en_US
dc.subjectPreventive Maintenanceen_US
dc.subjectLeased Equipmenten_US
dc.subjectMinimal Repairen_US
dc.subjectValue functionen_US
dc.title대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발en_US
dc.title.alternativeDeveloping a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipmenten_US
dc.typeArticleen_US
dc.relation.no2-
dc.relation.volume41-
dc.relation.page1-8-
dc.relation.journal산업경영시스템학회지-
dc.contributor.googleauthor이주현-
dc.contributor.googleauthor배기호-
dc.contributor.googleauthor안선응-
dc.relation.code2018019272-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING-
dc.identifier.pidsunahn-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE