Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 홍승호 | - |
dc.date.accessioned | 2019-03-06T02:20:37Z | - |
dc.date.available | 2019-03-06T02:20:37Z | - |
dc.date.issued | 2017-01 | - |
dc.identifier.citation | IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, v. 64, No. 1, Page. 739-749 | en_US |
dc.identifier.issn | 1557-9948 | - |
dc.identifier.issn | 0278-0046 | - |
dc.identifier.uri | https://ieeexplore.ieee.org/document/7539665 | - |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/100503 | - |
dc.description.abstract | During periods of power system stress, demand bidding (DB) programs encourage large electricity consumers to submit curtailment capacity bids and carry out load reduction, in return for financial rewards. In this paper, a real-time DB (RT-DB) program with applications in discrete manufacturing facilities is considered. A discrete manufacturing production model is constructed and an automated RT-DB algorithm is designed. An optimization problem, where the objective is to maximize the profits for manufacturers, is formulated. Solving this problem enables the RT-DB algorithm to automatically generate optimal load-reduction bids with adjusted production and energy plans. A case study is described, which shows that the proposed algorithm reduced the load demand during an RT-DB event, increasing the manufacturer's profits. Furthermore, the relationship between the incentive rate and the demand elasticity of the consumer, as well as the production volume and profits is described. | en_US |
dc.description.sponsorship | This work was supported in part by the Human Resources Program in Energy Technology of the Korea Institute of Energy Technology Evaluation and Planning, supported by the Ministry of Trade, Industry and Energy, South Korea, under Grant 20154030200730 and in part by the GRRC Program of Gyeonggi Province (GRRC Hanyang 2016-B02, Development of Industrial Communication-IoT Gateway). | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC | en_US |
dc.subject | Discrete manufacturing | en_US |
dc.subject | incentive-based demand response | en_US |
dc.subject | industrial energy management | en_US |
dc.subject | SCHEME | en_US |
dc.title | Real-Time Demand Bidding for Energy Management in Discrete Manufacturing Facilities | en_US |
dc.type | Article | en_US |
dc.relation.no | 1 | - |
dc.relation.volume | 64 | - |
dc.identifier.doi | 10.1109/TIE.2016.2599479 | - |
dc.relation.page | 739-749 | - |
dc.relation.journal | IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS | - |
dc.contributor.googleauthor | Li, Yi-Chang | - |
dc.contributor.googleauthor | Hong, Seung Ho | - |
dc.relation.code | 2017001932 | - |
dc.sector.campus | E | - |
dc.sector.daehak | COLLEGE OF ENGINEERING SCIENCES[E] | - |
dc.sector.department | DIVISION OF ELECTRICAL ENGINEERING | - |
dc.identifier.pid | shhong | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.