2005-05 | Delay of the Slotted ALOHA Protocol with Binary Exponential Backoff Algorithm | 허선 |
2006-11 | Departure Process of a Single Server Queueing System with Markov Renewal input and General Service Time Distribution | 허선 |
2006-11 | DEPARTURE PROCESS OF SINGLE SERVER QUEUEING SYSTEM WITH MARKOV RENEWAL INPUT AND GENERAL SERVICE TIMES | 허선 |
2002-10 | Deriving a Likelihood Model for Fatigue Lifetime Based on the Physics of Crack-Propagation | 허선 |
2015-12 | Determination of Optimal Shipping Quantity for Perishable Goods under Probabilistic Supply | 허선 |
2012-12 | Determination of production level in a make-to-stock system with stochastic demands and returns | 허선 |
2020-07 | Development of Indicator of Data Sufficiency for Feature-based Early Time Series Classification with Applications of Bearing Fault Diagnosis | 허선 |
2016-11 | The Dynamic Enterprise Network Composition Algorithm for Efficient Operation in Cloud Manufacturing | 허선 |
2020-06 | Dynamic estimation model for collaboration potential in cloud manufacturing based on markov random fields | 허선 |
2007-11 | An ECA-based Mechanism of Non-blocking Device Coordination for a Ubiquitous Environment | 허선 |
2015-11 | Effect of Unequal Lot Sizes, Variable Setup Cost, and Carbon Emission Cost in a Supply Chain Model | 허선 |
2017-05 | Effects of variable production rate and time-dependent holding cost for complementary products in supply chain model | 허선 |
2020-04 | Efficient genetic algorithm for feature selection for early time series classification | 허선 |
2007-11 | An Evaluation Model of Multimedia Composition Processes | 허선 |
2000-04 | Gate와 threshold가 있는 2단계 서비스의 MX/G/1 모형 | 허선 |
2019-12 | Graphical Model to Diagnose Product Defects with Partially Shuffled Equipment Data | 허선 |
2023-09 | GUM 기반 측정불확도의 평가 및 적용에 의한 품질개선 | 허선 |
2020-03 | Improvement of Productivity through the Reduction of Unexpected Equipment Faults in Die Attach Equipment | 허선 |
2002-07 | Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain | 허선 |
2019-02 | Interactive Q-Learning Approach for Pick-and-Place Optimization of the Die Attach Process in the Semiconductor Industry | 허선 |
2000-06 | M/G/c 대기행렬 시스템의 대기고객수 분석에 대한 근사법 | 허선 |
1999-10 | M/G/c 대기행렬시스템의 대기고객수 분석에 대한 2단계 근사법 | 허선 |
2001-03 | Main queue에 threshold가 있는 M/G/1 Bernoulli feedback 시스템 분석 | 허선 |
2015-11 | Markov Network Model with Unreliable Edges | 허선 |
2020-01 | A Membership Probability Based Undersampling Algorithm for Imbalanced Data | 허선 |
2021-02 | Multiobjective Real-Time Scheduling of Tasks in Cloud Manufacturing with Genetic Algorithm | 허선 |
2000-06 | N 정책과 T 정책이 적용되는 M/G/1 시스템의 분석 | 허선 |
1999-10 | N-정책과 T-정책이 적용되는 M/G/1 시스템의 분석 | 허선 |
2001-11 | N정책과 예외적인 첫 휴가가 있는 Mx/G/1 시스템 분석 | 허선 |
2001-04 | N정책과 예외적인 첫휴가가 있는 M^X/G/1 시스템 분석 | 허선 |