Full metadata record

DC FieldValueLanguage
dc.contributor.author양내원-
dc.date.accessioned2019-02-18T02:16:03Z-
dc.date.available2019-02-18T02:16:03Z-
dc.date.issued2018-12-
dc.identifier.citation의료·복지 건축, v. 24, No. 4, Page. 7-15en_US
dc.identifier.issn1975-3349-
dc.identifier.urihttp://kiss.kstudy.com/thesis/thesis-view.asp?key=3652903-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/98999-
dc.description.abstractPurpose: The life span of a hospital building is short. This is because the building will have to be built up due to the fact that it can not cope with the new medical environment, it can not be replaced due to low floor height, lack of land. The purpose of the hospital building master plan is to find a way to fulfill its role in the long term. Methods: Comparison the proposals submitted by the master plan and the proposals submitted by the hospitals, the case of three hospitals that have established a master plan for the past three years. In addition, interviews with the designers who participated in the design competition and the administrator of hospital about the variables that occurred during the business process. Results: The result of this study can be summarized into four points. The first one is that master plan is changed by administrator of hospital so that Thy need to understand about the role of master plan. And next is to protect reduction of the project cost. Third, continuous participation of master plan researchers in following projects is good to communicate with administrator and designer. The last one is empathy of master plan by designer and users. Implications: It is necessary to reduce changing of master plan in design process for sustainable managing of hospital.en_US
dc.language.isoko_KRen_US
dc.publisher한국의료복지건축학회en_US
dc.subjectReasonen_US
dc.subjectChangeen_US
dc.subjectDesign Processen_US
dc.subjectMaster Planen_US
dc.subject원인en_US
dc.subject변경en_US
dc.subject설계과정en_US
dc.subject마스터플랜en_US
dc.title병원건축 마스터플랜이 설계과정에서 변경되는 원인에 관한 연구en_US
dc.title.alternativeA Study on the Reason for Change of Master Plan of Hospital Architecture in Design Processen_US
dc.typeArticleen_US
dc.relation.no4-
dc.relation.volume24-
dc.relation.page7-15-
dc.relation.journal의료·복지 건축-
dc.contributor.googleauthorPark, Cheolkyun-
dc.contributor.googleauthorYang, Naewon-
dc.relation.code2018019215-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDIVISION OF ARCHITECTURE-
dc.identifier.pidnwyang-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > ARCHITECTURE(건축학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE