574 0

Full metadata record

DC FieldValueLanguage
dc.contributor.advisor문승재-
dc.contributor.authorBeomjin Kim-
dc.date.accessioned2018-09-18T00:45:15Z-
dc.date.available2018-09-18T00:45:15Z-
dc.date.issued2018-08-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/75786-
dc.identifier.urihttp://hanyang.dcollection.net/common/orgView/200000433356en_US
dc.description.abstractThis paper presents the simulation in the transient condition of the bottoming cycle of a 400-MW combined cycle power plant (CCPP), which includes the heat recovery steam generator (HRSG) and triple-pressure reheat steam cycle. The CCPP operates load-following to adjust the varying electric power demand every moment. Thus, an accurate simulation program to calculate the transient behavior of CCPP with load-following operation is required because of unoptimized commercial simulating programs. The pressures, flowrates and temperatures of each heat exchanger and the power outputs of each steam turbine change in part load conditions because of the varying flue gas conditions. A proportional–derivative (PD) controller was used to analyze the water level control in the drums at each pressure with the greatest effect on the stability of the bottoming cycle of the CCPP.-
dc.publisher한양대학교-
dc.titleDynamic simulation analysis of the bottoming cycle of a 400-MW combined cycle power plant with proportional-derivative control of the drum water level-
dc.typeTheses-
dc.contributor.googleauthor김범진-
dc.sector.campusS-
dc.sector.daehak대학원-
dc.sector.department융합기계공학과-
dc.description.degreeMaster-
Appears in Collections:
GRADUATE SCHOOL[S](대학원) > MECHANICAL CONVERGENCE ENGINEERING(융합기계공학과) > Theses (Master)
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE