429 0

Full metadata record

DC FieldValueLanguage
dc.contributor.authorSarkar, Biswajit-
dc.date.accessioned2018-07-17T02:47:49Z-
dc.date.available2018-07-17T02:47:49Z-
dc.date.issued2017-11-
dc.identifier.citationMATHEMATICAL PROBLEMS IN ENGINEERING, v. 2017, Article ID. 2825103en_US
dc.identifier.issn1024-123X-
dc.identifier.issn1563-5147-
dc.identifier.urihttps://www.hindawi.com/journals/mpe/2017/2825103/abs/-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/72616-
dc.description.abstractRecently, a major trend is going to redesign a production system by controlling or making variable the production rate within some fixed interval to maintain the optimal level. This strategy is more effective when the holding cost is time-dependent as it is interrelated with holding duration of products and rate of production. An effort is made to make a supply chain model (SCM) to show the joint effect of variable production rate and time-varying holding cost for specific type of complementary products, where those products are made by two different manufacturers and a common retailer makes them bundle and sells bundles to end customers. Demand of each product is specified by stochastic reservation prices with a known potential market size. Those players of the SCM are considered with unequal power. Stackelberg game approach is employed to obtain global optimum solution of the model. An illustrative numerical example, graphical representation, and managerial insights are given to illustrate the model. Results prove that variable production rate and time-dependent holding cost save more than existing literature.en_US
dc.language.isoen_USen_US
dc.publisherHINDAWI PUBLISHING CORPen_US
dc.subjectIMPERFECT PRODUCTION PROCESSen_US
dc.subjectPRODUCTION-INVENTORY MODELen_US
dc.subjectINFORMATION ASYMMETRYen_US
dc.subjectDETERIORATION RATEen_US
dc.subjectPRICE-COMPETITIONen_US
dc.subjectEOQ MODELen_US
dc.subjectDEMANDen_US
dc.subjectGOODSen_US
dc.subjectRELIABILITYen_US
dc.subjectDISCOUNTSen_US
dc.titleEffects of Variable Production Rate and Time-Dependent Holding Cost for Complementary Products in Supply Chain Modelen_US
dc.typeArticleen_US
dc.identifier.doi10.1155/2017/2825103-
dc.relation.page1-14-
dc.relation.journalMATHEMATICAL PROBLEMS IN ENGINEERING-
dc.contributor.googleauthorSarkar, Mitali-
dc.contributor.googleauthorHur, Sun-
dc.contributor.googleauthorSarkar, Biswajit-
dc.relation.code2017012211-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING-
dc.identifier.pidbsarkar-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE