Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Sarkar, Biswajit | - |
dc.date.accessioned | 2018-06-04T06:06:03Z | - |
dc.date.available | 2018-06-04T06:06:03Z | - |
dc.date.issued | 2017-03 | - |
dc.identifier.citation | MATHEMATICAL PROBLEMS IN ENGINEERING, V. 2017, Article ID 6465912 | en_US |
dc.identifier.issn | 1024-123X | - |
dc.identifier.issn | 1563-5147 | - |
dc.identifier.uri | https://www.hindawi.com/journals/mpe/2017/6465912/ | - |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/71820 | - |
dc.description.abstract | This model extends a two-echelon supply chain model by considering the trade-credit policy, transportations discount to make a coordination mechanism between transportation discounts, trade-credit financing, number of shipments, quality improvement of products, and reduced setup cost in such a way that the total cost of the whole system can be reduced, where the supplier offers trade-credit-period to the buyer. For buyer, the backorder rate is considered as variable. There are two investments to reduce setup cost and to improve quality of products. The model assumes lead time-dependent backorder rate, where the lead time is stochastic in nature. By using the trade-credit policy, the model gives how the credit-period would be determined to achieve the win-win outcome. An iterative algorithm is designed to obtain the global optimum results. Numerical example and sensitivity analysis are given to illustrate the model. | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | HINDAWI PUBLISHING CORP | en_US |
dc.subject | INTEGRATED INVENTORY MODEL | en_US |
dc.subject | ORDERING COST REDUCTION | en_US |
dc.subject | IMPERFECT PRODUCTION PROCESS | en_US |
dc.subject | PERMISSIBLE DELAY | en_US |
dc.subject | SETUP COST | en_US |
dc.subject | QUALITY IMPROVEMENT | en_US |
dc.subject | EOQ MODEL | en_US |
dc.subject | PAYMENTS | en_US |
dc.subject | VENDOR | en_US |
dc.subject | POLICY | en_US |
dc.title | Supply Chain Model with Stochastic Lead Time, Trade-Credit Financing, and Transportation Discounts | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.1155/2017/6465912 | - |
dc.relation.page | 1-15 | - |
dc.relation.journal | MATHEMATICAL PROBLEMS IN ENGINEERING | - |
dc.contributor.googleauthor | Kim, Sung Jun | - |
dc.contributor.googleauthor | Sarkar, Biswajit | - |
dc.relation.code | 2017012211 | - |
dc.sector.campus | E | - |
dc.sector.daehak | COLLEGE OF ENGINEERING SCIENCES[E] | - |
dc.sector.department | DEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING | - |
dc.identifier.pid | bsarkar | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.