Study on the major delay factors in finishing works before completion of construction

Title
Study on the major delay factors in finishing works before completion of construction
Author
김재준
Keywords
Process Management; Delay of Construction Period; Finishing Work
Issue Date
2011-06
Publisher
ISARC2011
Citation
, Page. -
Abstract
There are many variations and risks in construction work and the risk is getting increased in accordance of big scale, variation and complexity for the construction work. If the process management is not planned thoroughly, it affects the construction period. . The delay of construction period causes the increase of project budget and low productivityand it is the cause of poor construction for recovering the long-term suspension of construction in construction work. There are various problems such as low quality, negligent accidents, etc. Especially, the delay of finishing work can be fatal beforethe completion of construction. It is study on analysis of the influence factor for delay of construction period and how to apply in real work site in finishing work. It is regarded that this study will lead to thorough process movement in work site and critical data.
URI
http://www.irbnet.de/daten/iconda/CIB_DC23586.pdfhttps://repository.hanyang.ac.kr/handle/20.500.11754/70465
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > ARCHITECTURAL ENGINEERING(건축공학부) > Articles
Files in This Item:
CIB_DC23586.pdfDownload
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE