232 0

Tunnels Construction Planning and Suggestions to Speed up Tunnel Excavation Progress

Title
Tunnels Construction Planning and Suggestions to Speed up Tunnel Excavation Progress
Author
조병완
Keywords
Tunnels; Excavation cycle; rock quality; planning; suggestions; progress
Issue Date
2014-10
Publisher
대한토목학회
Citation
제40회 대한토목학회 정기 학술대회, [2014/10], pp. 591-592(2 pages)
Abstract
Main aim of this study is to explain some suggestions which can be adopt during tunnels construction by drill and blast. These suggestions are supportive to increase tunnel construction progress. These suggestions basically reduce tunnel excavation cycle by skipping temporarily some activities. Skipped activities can be carries out later on by combining for two to three cycles. All of these suggestions are dependent upon rock class, water inflow rate and rock stand up time. At one hydro power project these suggestions were practically applied to tunnels construction and reduction in time cycle time was more than 4 hours.
URI
http://www.dbpia.co.kr/Journal/ArticleDetail/NODE06084567http://hdl.handle.net/20.500.11754/58506
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > CIVIL AND ENVIRONMENTAL ENGINEERING(건설환경공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE