2019-12 | A Graphical Model to Diagnose Product Defects with Partially Shuffled Equipment Data | 허선 |
2021-04 | A Membership Probability–Based Undersampling Algorithm for Imbalanced Data | 허선 |
2016-12 | A MODEL FOR DETERMINING OPTIMAL BATCH SIZES OF MULTI-FEATURED PRODUCTS WITH RANDOM PROCESSING ACCURACIES UNDER QUALITY AND COST CONSTRAINTS | 허선 |
2005-12 | A multiechelon repairable item inventory system with lateral transshipment and a general repair time distribution | 허선 |
2021-07 | A Time-Series Data Generation Method to Predict Remaining Useful Life | 허선 |
2018-11 | A3C 깊은 강화학습을 이용한 다수의 의존적 창고 재고관리 스케줄링 | 허선 |
2007-05 | An Algorithm for Repairable Item Inventory System with Depot Spares and General Repair Time Distribution | 허선 |
2002-10 | An analysis of AS/RS performing both single and dual commands | 허선 |
2003-08 | An analysis of the M/G/1 system with N and T policy | 허선 |
2006-10 | AN ANALYSIS OF THE PERFORMANCE OF BINARY EXPONENTIAL BACKOFF ALGORITHM IN A RANDOM ACCESS PACKETS NETWORKS | 허선 |
2005-05 | An Analytic Model for Correlated Traffics in Computer-Communication Networks | 허선 |
2002-12 | Asymptotic properties of a particular nonlinear regression quantile estimation | 허선 |
2002-10 | ATM traffic modelling by Markov renewal processes | 허선 |
2005-12 | Batch arrival queues with vacations and server setup | 허선 |
2018-08 | Bayesian Network Model to Diagnose WMSDs with Working Characteristics | 허선 |
2020-04 | Bayesian network model to diagnose WMSDs with working characteristics | 허선 |
2015-04 | C-CRF를 이용한 복합화력발전소의 발전량 예측 | 허선 |
2020-01 | Clustering and Dispatching Rule Selection Framework for Batch Scheduling | 허선 |
2016-06 | Continuous Conditional Random Field Model for Predicting Electrical Power Output of a Combined Cycle Power Plant | 허선 |
2016-06 | Continuous Conditional Random Field Model for Predicting the Electrical Load of a Combined Cycle Power Plant | 허선 |
2015-02 | Continuous Conditional Random Field에 의한 인터넷 쇼핑몰 신규 고객등급 예측 | 허선 |
2016-06 | Control of G/M-X/1 Queueing System with N-Policy and Customer Impatience | 허선 |
2016-06 | Control of G/MX/1 Queueing System with N-Policy and Customer Impatience | 허선 |
2012-12 | Control of lead time for retailer-supplier contract with stochastic demand and order cancellation | 허선 |
2005-05 | Delay of the Slotted ALOHA Protocol with Binary Exponential Backoff Algorithm | 허선 |
2006-11 | Departure Process of a Single Server Queueing System with Markov Renewal input and General Service Time Distribution | 허선 |
2006-11 | DEPARTURE PROCESS OF SINGLE SERVER QUEUEING SYSTEM WITH MARKOV RENEWAL INPUT AND GENERAL SERVICE TIMES | 허선 |
2002-10 | Deriving a Likelihood Model for Fatigue Lifetime Based on the Physics of Crack-Propagation | 허선 |
2012-12 | Determination of production level in a make-to-stock system with stochastic demands and returns | 허선 |
2020-07 | Development of Indicator of Data Sufficiency for Feature-based Early Time Series Classification with Applications of Bearing Fault Diagnosis | 허선 |