2017-10 | An integrated inventory model with variable transportation cost, two-stage inspection, and defective items | 신동민 |
2017-04 | An integrated location-allocation model for temporary disaster debris management under an uncertain environment | Biswajit Sarkar |
2000-12 | Integrated Machine Tool Selection and Operation Sequencing with Capacity and Precedence Constraints using Genetic Algorithm | 이영해 |
2002-09 | Integrated Machine Tool Selection and Operation Sequencing with Capacity and Precedence Constraints using Genetic Algorithm | 이영해 |
2000-11 | An Integrated Model For Process Planning And Scheduling With Outsourcing In Manufacturing Supply Chain | 이영해 |
2008-05 | Integrated process planning and scheduling in a supply chain | 이영해 |
2002-07 | Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain | 허선 |
2002-07 | Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain | 김종수 |
2021-01 | Integrating Machine Learning, Radio Frequency Identification, and Consignment Policy for Reducing Unreliability in Smart Supply Chain Management | 김병훈 |
2024-05-06 | Integration of eye-tracking and object detection in a deep learning system for quality inspection analysis | 서경민 |
2019-02 | Interactive Q-Learning Approach for Pick-and-Place Optimization of the Die Attach Process in the Semiconductor Industry | 허선 |
2003-05 | An Interpretation of the Mixture of Poisson Distributions with a Gamma Distributed Parameter | 안선응 |
2016-12 | Interval‑valued fuzzy φ‑tolerance competition graphs | Sarkar, Biswajit |
2018-11 | Inventory and pricing decisions for imperfect quality items with inspection errors, sales returns, and partial backorders under inflation | Sarkar, Biswajit |
2000-11 | Inventory Control in Supply Chain System with Returning Goods | 이영해 |
2018-11 | Inventory control model for a supply chain system with multiple types of items and minimum order size requirements | 김종수 |
2015-06 | An inventory model with trade-credit policy and variable deterioration for fixed lifetime products | Biswajit Sarkar |
2018-11 | Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages | Sarkar, Biswajit |
2010-03 | IP 기반 융합서비스를 위한 서비스 충돌 감지 및 해결에 대한 연구 | 신동민 |
2001-11 | ISO9000 : 1994 규격과 ISO9000 : 2000 규격의 비교 분석 | 강창욱 |