2021-06 | 3D맵핑을 활용한 노후 공동주택 안전점검의 기초연구 | 안용한 |
2018-07 | Advanced Wireless Sensor Networks for Sustainable Buildings Using Building Ducts | 안용한 |
2020-11 | AECO(Architect, Engineering, Construction and Operation) 업계에서의 BIM 아웃소싱 현황 분석에 관한 기초 연구 | 안용한 |
2021-06 | Analysis of embodied carbon emissions for a relocatable modular steel building in south korea | 안용한 |
2016-03 | An analysis of energy consumption to identify urban energy poverty in Seoul | 안용한 |
2018-10 | Analyzing the FinishingWorks Service Life Pattern of public housing in South Korea by Probabilistic Approach | 안용한 |
2018-10 | Analyzing the Long-Term Service Life of MEP Using the Probabilistic Approach in Residential Buildings | 안용한 |
2019-06 | Assessments of Intuition and Efficiency: Remote Control of the End Point of Excavator in Operational Space by Using One Wrist | 안용한 |
2020-12 | Automatic Concrete Damage Recognition Using Multi-Level Attention Convolutional Neural Network | 안용한 |
2019-05 | BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea | 안용한 |
2021-06 | BIM을 활용한 건축물 손상부위 표현을 위한 디지털 트윈 기초연구 | 안용한 |
2019-05 | Business Models and Performance of International Construction Companies | 안용한 |
2020-03 | Classifying the Business Model Types of International Construction Contractors | 안용한 |
2021-07 | Comparison of Building Simulation Methods for Modeling Apartment Balconies | 안용한 |
2020-01 | A Comprehensive Analysis: Sustainable Trends and Awarded LEED 2009 Credits in Vietnam | 안용한 |
2021-04 | A Comprehensive Review of The Construction Materials Databases Contributed to The Sustainable Building | 안용한 |
2019-10 | Configuration Optimization for End-Point Stabilization of Redundant Manipulators With Base Flexibility | 안용한 |
2017-02 | Construction management risk system (CMRS) for construction management (CM) firms | 안용한 |
2017-12 | Construction process framework for a green building projects | 안용한 |
2020-04 | Creation of One Excavator as an Obstacle in C-Space for Collision Avoidance during Remote Control of the Two Excavators Using Pose Sensors | 안용한 |
2021-04 | DBB 방식에서 설계자와 계약자의 BIM 기반 협업의 현재 문제점 파악에 관한 연구 | 안용한 |
2021-05 | Developing a machine learning-based building repair time estimation model considering weight assigning methods | 안용한 |
2021-11 | Developing a Risk Management Process for General Contractors in the Bidding Stage for Design-Build Projects in Vietnam | 안용한 |
2020-12 | Developing risk breakdown structure for nuclear power plant decommissioning projects in Korea focusing on radioactive concrete dismantle | 안용한 |
2016-02 | Development of a green road rating system for South Korea | 안용한 |
2019-04 | Development of an Energy Saving Strategy Model for Retrofitting Existing Buildings: A Korean Case Study | 안용한 |
2016-04 | The development of an energy-efficient remodeling framework in South Korea | 안용한 |
2018-06 | Development of Improved Frequency Expressions for Composite Horizontally Curved Bridges with High-Performance Steel Girders | 안용한 |
2016-04 | Effect of Chlorides on Conductivity and Dielectric Constant in Hardened Cement Mortar: NDT for Durability Evaluation | 안용한 |
2021-08 | Effect of Waste Ceramic Powder on Properties of Alkali-Activated Blast Furnace Slag Paste and Mortar | 안용한 |