2021-03 | Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times | 이동호 |
2012-10 | Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines | 이동호 |
2013-08 | Heterogeneous fixed fleet vehicle routing considering carbon emission | 이동호 |
2012-10 | Heuristic algorithms for minimising total recovery cost of end-of-life products under quality constraints | 이동호 |
2020-12 | A Heuristic for Service-Parts Lot-Sizing with Disassembly Option | 이동호 |
2013-07 | Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures | 이동호 |
2015-01 | An integrated approach for collection network design, capacity planning and vehicle routing in reverse logistics | 이동호 |
2012-05 | An Integrated Model for Collection Network Design and Capacity Planning in Reverse Logistics | 이동호 |
2017-10 | Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups | 이동호 |
2017-06 | Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops | 이동호 |
2012-12 | Iterative algorithms for part grouping and loading in cellular reconfigurable manufacturing systems | 이동호 |
2012-01 | Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints | 이동호 |
2019-03 | Loading and scheduling for flexible manufacturing systems with controllable processing times | 이동호 |
2012-02 | Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling | 이동호 |
2018-03 | Mathematical model and solution algorithms for capacitated dynamic lot-sizing in remanufacturing systems | 이동호 |
2013-08 | Mathematical model and solution algorithms for selective disassembly sequencing with multiple target components and sequence-dependent setups | 이동호 |
2018-04 | Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality | 이동호 |
2019-05 | Multi-period heterogeneous vehicle routing considering carbon emission trading | 이동호 |
2013-09 | Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm | 이동호 |
2014-12 | AN OPERATION-LEVEL DYNAMIC CAPACITY SCALABILITY MODEL FOR RECONFIGURABLE MANUFACTURING SYSTEMS | 이동호 |
2020-06 | Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets | 이동호 |
2017-12 | An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment | 이동호 |
2011-05 | Priority Rule Based Heuristics for the Team Orienteering Problem | 이동호 |
2013-06 | A priority scheduling approach for flexible job shops with multiple process plans | 이동호 |
2016-03 | Priority scheduling for a flexible job shop with a reconfigurable manufacturing cell | 이동호 |
2017-08 | Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines | 이동호 |
2011-04 | Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line | 이동호 |
2013-12 | A restricted dynamic model for refuse collection network design in reverse logistics | 이동호 |
2018-04 | A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times | 이동호 |
2018-06 | Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement | 이동호 |