Browsing "INDUSTRIAL ENGINEERING(산업공학과)" byAuthor이동호

Jump to:
All A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
  • Sort by:
  • In order:
  • Results/Page
  • Authors/Record:

Showing results 16 to 45 of 62

Issue DateTitleAuthor(s)
2021-03Fast and meta heuristics for part selection in flexible manufacturing systems with controllable processing times이동호
2012-10Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines이동호
2013-08Heterogeneous fixed fleet vehicle routing considering carbon emission이동호
2012-10Heuristic algorithms for minimising total recovery cost of end-of-life products under quality constraints이동호
2020-12A Heuristic for Service-Parts Lot-Sizing with Disassembly Option이동호
2013-07Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures이동호
2015-01An integrated approach for collection network design, capacity planning and vehicle routing in reverse logistics이동호
2012-05An Integrated Model for Collection Network Design and Capacity Planning in Reverse Logistics이동호
2017-10Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups이동호
2017-06Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops이동호
2012-12Iterative algorithms for part grouping and loading in cellular reconfigurable manufacturing systems이동호
2012-01Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints이동호
2019-03Loading and scheduling for flexible manufacturing systems with controllable processing times이동호
2012-02Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling이동호
2018-03Mathematical model and solution algorithms for capacitated dynamic lot-sizing in remanufacturing systems이동호
2013-08Mathematical model and solution algorithms for selective disassembly sequencing with multiple target components and sequence-dependent setups이동호
2018-04Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality이동호
2019-05Multi-period heterogeneous vehicle routing considering carbon emission trading이동호
2013-09Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm이동호
2014-12AN OPERATION-LEVEL DYNAMIC CAPACITY SCALABILITY MODEL FOR RECONFIGURABLE MANUFACTURING SYSTEMS이동호
2020-06Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets이동호
2017-12An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment이동호
2011-05Priority Rule Based Heuristics for the Team Orienteering Problem이동호
2013-06A priority scheduling approach for flexible job shops with multiple process plans이동호
2016-03Priority scheduling for a flexible job shop with a reconfigurable manufacturing cell이동호
2017-08Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines이동호
2011-04Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line이동호
2013-12A restricted dynamic model for refuse collection network design in reverse logistics이동호
2018-04A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times이동호
2018-06Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement이동호

BROWSE