해외 발전플랜트 EPC 사업의 리스크 분석 및 관리방안

Title
해외 발전플랜트 EPC 사업의 리스크 분석 및 관리방안
Other Titles
Risk management in the EPC business for overseas power plant projects
Author
이재헌
Keywords
해외 발전플랜트; EPC 사업; 리스크; 영향도; 관리방안; overseas power plant; EPC project; risk; Impact scale; management method
Issue Date
2011-09
Publisher
한국플랜트학회
Citation
플랜트 저널, 2011, 7(3), P.48-64
Abstract
In this work, risks in EPC project for overseas power plant projects are analyzed and risk management methods are suggested to reduce cost and to shorten time. 79% of risks occurred in the engineering phase for S project located in South-East Asia. The impact scales of risks on major project objectives which are cost, time, scope, and quality are analyzed as 3.5, 3.8, 2.7, and 3.7, respectively. The level of impact scales is very similar to each other except the impact scale of scope. The risk management methods suggested in this study have to be applied at the appropriate time to manage risks effectively. After that, risks are managed continuously by monitoring.
URI
http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201116853108302&dbt=JAKO&org_code=O483&site_code=SS1483&service_code=01
ISSN
1739-7200; 1976-8702
Appears in Collections:
COLLEGE OF ENGINEERING[S](공과대학) > MECHANICAL ENGINEERING(기계공학부) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE