Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 이동희 | - |
dc.date.accessioned | 2022-03-10T00:54:16Z | - |
dc.date.available | 2022-03-10T00:54:16Z | - |
dc.date.issued | 2020-06 | - |
dc.identifier.citation | QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v. 36, no. 6, page. 1982-2002 | en_US |
dc.identifier.issn | 0748-8017 | - |
dc.identifier.issn | 1099-1638 | - |
dc.identifier.uri | https://onlinelibrary.wiley.com/doi/10.1002/qre.2669 | - |
dc.identifier.uri | https://repository.hanyang.ac.kr/handle/20.500.11754/168959 | - |
dc.description.abstract | Most manufacturing industries produce products through a series of sequential stages, known as a multistage process. In a multistage process, each stage affects the stage that follows, and the process often has multiple response variables. In this paper, we suggest a new procedure for optimizing a multistage process with multiple response variables. Our method searches for an optimal setting of input variables directly from operational data according to a patient rule induction method (PRIM) to maximize a desirability function, to which multiple response variables are converted. The proposed method is explained by a step-by-step procedure using a steel manufacturing process as an example. The results of the steel manufacturing process optimization show that the proposed method finds the optimal settings of input variables and outperforms the other PRIM-based methods. | en_US |
dc.description.sponsorship | National Research Foundation of Korea, Grant/Award Numbers: 2016K2A9A2A11938390, FY2017 | en_US |
dc.language.iso | en | en_US |
dc.publisher | WILEY | en_US |
dc.subject | desirability | en_US |
dc.subject | function | en_US |
dc.subject | multiresponse optimization | en_US |
dc.subject | multistage process | en_US |
dc.subject | patient rule induction method | en_US |
dc.subject | quality management | en_US |
dc.title | Multiresponse optimization of a multistage manufacturing process using a patient rule induction method | en_US |
dc.type | Article | en_US |
dc.relation.no | 6 | - |
dc.relation.volume | 36 | - |
dc.identifier.doi | 10.1002/qre.2669 | - |
dc.relation.page | 1982-2002 | - |
dc.relation.journal | QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL | - |
dc.contributor.googleauthor | Lee, Dong-Hee | - |
dc.contributor.googleauthor | Yang, Jin-Kyung | - |
dc.contributor.googleauthor | Kim, Kwang-Jae | - |
dc.relation.code | 2020050047 | - |
dc.sector.campus | S | - |
dc.sector.daehak | SCHOOL OF INTERDISCIPLINARY INDUSTRIAL STUDIES[S] | - |
dc.sector.department | SCHOOL OF INTERDISCIPLINARY INDUSTRIAL STUDIES | - |
dc.identifier.pid | dh | - |
dc.identifier.orcid | https://orcid.org/0000-0001-8549-8992 | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.