222 0

Full metadata record

DC FieldValueLanguage
dc.contributor.author허선-
dc.date.accessioned2021-02-09T05:11:22Z-
dc.date.available2021-02-09T05:11:22Z-
dc.date.issued2002-06-
dc.identifier.citation한국경영과학회지, v. 27, no. 2, page. 111-122en_US
dc.identifier.issn1225-1119-
dc.identifier.issn2733-4759-
dc.identifier.urihttps://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE00410799-
dc.identifier.urihttps://repository.hanyang.ac.kr/handle/20.500.11754/158020-
dc.description.abstractin this paper we analyze an Mx/G/1 with three types of vacation periods including setup time. Three types of vacations are: N-poilcy single vacation and multiple vacation. We consider compound Poisson arrival process and general service time, where the server starts his service when a setup is completed. We find the PGF of the number of customers in system and LST of waiting time with which we obtain their means. A decomposition property for the system size and waiting time is described also.en_US
dc.description.sponsorship이 논문은 2001년 한양대학교 교내연구비 지원으로 연구되었음.en_US
dc.language.isoko_KRen_US
dc.publisher한국경영과학회en_US
dc.subjectbatch arrivalen_US
dc.subjectvacationen_US
dc.subjectthresholden_US
dc.subjectsetupen_US
dc.title준비기간을 포함한 다양한 휴가형태에서의 M^X/G/1 시스템 분석en_US
dc.title.alternativeAn analysis of the Mx/G/1 system with various vacations and set-up timeen_US
dc.typeArticleen_US
dc.relation.journal한국경영과학회지-
dc.contributor.googleauthor허선-
dc.contributor.googleauthor윤영호-
dc.contributor.googleauthor안선응-
dc.relation.code2012101345-
dc.sector.campusE-
dc.sector.daehakCOLLEGE OF ENGINEERING SCIENCES[E]-
dc.sector.departmentDEPARTMENT OF INDUSTRIAL AND MANAGEMENT ENGINEERING-
dc.identifier.pidhursun-
Appears in Collections:
COLLEGE OF ENGINEERING SCIENCES[E](공학대학) > INDUSTRIAL AND MANAGEMENT ENGINEERING(산업경영공학과) > Articles
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML


qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE